Skip to main content

Colombia seeks expressions of interest for Bogotá LRT

Colombia's national infrastructure agency ANI is to hold a public hearing on 16 December to gather expressions of interests for the 43.9 kilometre western corridor of Bogotá's light rail (LRT) project. The two-line LRT system is expected to cost around US$605 million and would stretch between the central station of the Sabana railway to a station located in the municipality of Facatativá. A total of 17 stations are planned for the corridor as well as a branch line to the airport. Around 71.5 million p
December 15, 2014 Read time: 1 min
Colombia's national infrastructure agency ANI is to hold a public hearing on 16 December to gather expressions of interests for the 43.9 kilometre western corridor of Bogotá's light rail (LRT) project.

The two-line LRT system is expected to cost around US$605 million and would stretch between the central station of the Sabana railway to a station located in the municipality of Facatativá.

A total of 17 stations are planned for the corridor as well as a branch line to the airport. Around 71.5 million passengers a year are expected to travel along the corridor.

Construction of the public-private partnership project is forecast to take 36 months, with the system estimated to be operational by 2018.

Related Content

  • Running on empty
    May 2, 2018
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate
  • TransCore develops nearly 100 miles of express lanes in Dallas/Fort Worth
    November 8, 2016
    TransCore is in the midst of deploying over 100 miles of express lanes throughout the Dallas/Fort Worth Metroplex, as part of an initiative to increase mobility along the region’s busiest corridors. With 34 lanes already operational, the Texas Department of Transportation (TxDOT) plans to mark the 100-mile milestone by the end of 2018.
  • Aecon consortium selected for Eglinton Crosstown light rail transit project
    June 11, 2015
    Crosslinx Transit Solutions, consisting of Aecon, ACS Infrastructure Canada, EllisDon, and SNC-Lavalin, has been selected by Metrolinx and Infrastructure Ontario as the preferred supplier for the development of the Eglinton Crosstown light rail transit project in Toronto.
  • Lima to invest in subway lines
    October 24, 2014
    Peru will invest nearly US$10 billion in the construction of Lima metro lines No. 3 and 4, private investment promotion agency ProInversión forecast at BNamericas 5th South America Infrastructure Summit. ProInversión recently awarded a pre-investment studies contract for line No. 3 and in coming the months will launch pre-investment and feasibility studies for line No. 4. "These are projects that, given similar characteristics to line No. 2 – more than 30 kilometres long and all built underground – s