Skip to main content

Colombia kicks off second wave of 4G highway plan

Colombia has published the pre-bid documents for the first concession under the second wave of the country's US$25 billion 4G highway plan, the 202 kilometre Puerta de Hierro-Palmar de Varela highway. Located in northern Colombia, the highway runs through the departments of Sucre, Atlántico and Bolívar. The project entails US$187 million improvement works on 175 kilometres, with construction estimated to take three years, said vice president Germán Vargas Lleras. The works are to be followed by a main
December 16, 2014 Read time: 2 mins
Colombia has published the pre-bid documents for the first concession under the second wave of the country's US$25 billion 4G highway plan, the 202 kilometre Puerta de Hierro-Palmar de Varela highway.

Located in northern Colombia, the highway runs through the departments of Sucre, Atlántico and Bolívar.

The project entails US$187 million improvement works on 175 kilometres, with construction estimated to take three years, said vice president Germán Vargas Lleras. The works are to be followed by a maintenance concession valued at US$54 billion.

Pre-bid documents are available on the national infrastructure agency's website, with the final specifications to be published in the next 10 business days, Vargas Lleras added. Bids are to be received in mid-April and the plan is to award the project in May.

4G involves the construction of 8,000 kilometres of roads, including 1,200 kilometres of four-lane highways, with the majority of projects to be carried out as PPPs.

Related Content

  • New Hampshire plans for tomorrow’s communication
    August 21, 2017
    Someone once likened predicting the future to ‘nailing a jelly to the wall’. With ITS, C-ITS and V2X technology progressing at such a pace, predicting the future is more akin to trying to nail three jellies to the wall – but only having one nail. And yet with roadways having a lifetime measured in decades, that is exactly what highway engineers and traffic planners are expected to do. Fortunately, New Hampshire DoT (NHDoT) believes its technological advances may be able to provide a solution. The Central Ne
  • Brisbane plans underground bus loop
    September 23, 2013
    Plans for an underground bus loop in Brisbane’s central business district (CBD) have been released at an estimated cost of US$2 billion, as the pre-feasibility report for the project has been completed. The bus loop, part of Brisbane council’s pre-feasibility study into the Suburbs 2 City Buslink project, is intended to reduce traffic congestion and bus travel times by connecting existing bus stations with new stations underground.
  • Washington launches multimodal transportation plan
    October 24, 2014
    Mayor Vincent C. Gray and District Department of Transportation (DDOT) director Matt Brown have released the final US$54 million moveDC Transportation Plan. The plan is a comprehensive, multimodal transportation strategy that outlines policies, programs and capital investments to enhance the District’s transportation network and includes detailed elements or master plans for each mode of travel in the District. The moveDC plan is the culmination of an 18-month process that has involved thousands of resid
  • China to back Brazil-Peru railway project
    May 15, 2015
    China is preparing a preliminary agreement with Brazil and Peru for the construction of a US$9.97 billion bi-national railway connecting the Atlantic Ocean in Brazil to the Pacific Ocean in Peru. Chinese Premier Li Keqiang is due to visit Brasília next week to seal China's partnership with Brazil, as part of a visit to map out an overall economic cooperation deal involving a total of US$53.3 billion in investments across various sectors such as mining, energy and manufacturing, as well as transportation