Skip to main content

Closer running and investment to boost capacity of Britain’s railways, says new report

Closer running to increase the frequency of train services, alongside investment in new railway infrastructure, are recommendations to boost UK rail capacity in the new report by the Institution of Mechanical Engineers and the Transportation Research Laboratory (TRL). The report, Increasing capacity; putting Britain’s railways back on track, makes recommendations to meet growing rail passenger demand, which is forecast to double by the 2040s. The Institution of Mechanical Engineers and TRL are offering s
January 4, 2017 Read time: 2 mins
Closer running to increase the frequency of train services, alongside investment in new railway infrastructure, are recommendations to boost UK rail capacity in the new report by the 5025 Institution of Mechanical Engineers and the Transportation Research Laboratory (TRL).

The report, Increasing capacity; putting Britain’s railways back on track, makes recommendations to meet growing rail passenger demand, which is forecast to double by the 2040s. The Institution of Mechanical Engineers and TRL are offering sustainable solutions for the challenges to ease crowding, improve punctuality, and unlock capacity.

The new report highlights changes already being implemented and makes four key recommendations for the rail industry and Government to further increase the UK railway capacity urgently:

It recommends speeding up new technologies already being worked on and pioneering closer-running to increase the frequency of train services and fast-track the development of secure train-to-train communication systems.

The report also proposes implementing the solutions already developed and making the most of technology like REPOINT for more reliable, quicker-operating sets of points and SUSTRAIL for faster freight.

It also suggests creating the next batch of new solutions, particularly post-Brexit, and ramping up British R&D investment to replace EU funding for new solutions, coupled with stimulation of matched private sector commitment to create better UK railways.

It calls for investment in the delivery of known solutions to relieve bottlenecks, including building new railway infrastructure for capacity (new high speed lines, electrification, local connectivity) and other well-proven techniques like flyovers and shorter signalling sections.

According to the report, the UK railway system carries more than twice as many passengers as 20 years ago; passengers per km have increased by 116 per cent and freight tonnage per km 34 per cent. Rail passenger demand is predicted to double again by the 2040s.

For more information on companies in this article

Related Content

  • Arriva wins Netherlands contract in Gelderland
    October 25, 2024
    Bus deal starts in December 2025 and could run until 2042 if extension applied
  • Road Safety Trust to fund pilot scheme to reduce tailgating
    July 5, 2016
    Transport & Travel Research (TTR) and parent company Transport Research Laboratory (TRL) have secured funding for a pilot scheme to reduce tailgating by business drivers from the Road Safety Trust, a charity that funds research to support its objective of reducing road casualties. TTR is now seeking interest from potential local authority partners that would act as a host for the pilot in their area. Tailgating, or close following, is a widespread concern on UK roads. It makes drivers feel intimidated,
  • EVs: Time for a rethink
    December 14, 2021
    Given a growing body of evidence that EVs are not the clean, green machines they are made out to be, Andrew Bunn suggests they can only be part of the puzzle – not the answer to environmental problems
  • Thales to modernise Egyptian railways signalling systems
    May 29, 2013
    In a contract valued at over US$141 million with Egyptian National Railways, Thales is to modernise the signalling systems on the Cairo-Alexandria corridor. The Cairo-Alexandria railway line is approximately 208 km long and is currently the busiest section of the Egyptian Railways network, carrying more than 25 million passengers per year. The turnkey contract includes design, supply, construction, phasing, commissioning and maintenance services. It covers the modernisation of the signalling as well as the