Skip to main content

Clearview Traffic shortlisted for two Highways Excellence Awards

Clearview Traffic Group has been shortlisted in two different categories for the Highways Magazine Excellence Awards 2012, with two diverse road delineation projects. In the Road Marking Project of the Year category, the company has been chosen as a finalist for its dynamic delineation project for the Hindhead Tunnel in Surrey, UK, where Clearview installed 868 Astucia IRS2 hardwired bi-directional road studs in a project initiated by the Highways Agency (HA) in 2007 to remove a major source of congestion a
September 28, 2012 Read time: 2 mins
557 Clearview Traffic Group has been shortlisted in two different categories for the Highways Magazine Excellence Awards 2012, with two diverse road delineation projects.

In the Road Marking Project of the Year category, the company has been chosen as a finalist for its dynamic delineation project for the Hindhead Tunnel in Surrey, UK, where Clearview installed 868 Astucia IRS2 hardwired bi-directional road studs in a project initiated by the 503 Highways Agency (HA) in 2007 to remove a major source of congestion around the A3/A287 junction.

According to Clearview, the hardwired road studs not only provide superior lane delineation with all the safety benefits, but also facilitate dynamic lane marking, allowing for normal running through each bore or a contraflow situation when one bore is closed.  Under normal running every other stud, therefore every 9m, is illuminated facing the oncoming traffic, whilst during contra flow arrangements every stud is illuminated in each direction at 4.5m intervals as a ‘do not cross’  instruction. This has given the operators the flexibility they require to maximise the safe and smooth continuous flow on this critical arterial road under all operating conditions.

The company has also been shortlisted jointly with Jacobs and Telford & Wrekin Council in the Road Safety Scheme or Project of the Year, for the A41 Chetwynd road safety scheme, which aims to decrease the number of collisions and reduce speeding drivers on this hazardous section of road.

The scheme runs along a dangerous stretch of the A41 in Chetwynd and is said to be a first in the UK, using both 1875 Astucia SolarLite and IRS1 hardwired intelligent road studs together with vehicle activated signs (VAS). During the hours of darkness the junction layout is defined using the road studs, delineating the road layout and shape also highlighting the turning lanes. Approaching vehicles travelling in excess of a predetermined trigger speed illuminate the VAS and the road studs increase in brightness to further highlight the junction layout and promote speed reduction.

The awards will be announced in London at a special awards dinner on Thursday 11th October 2012.

Related Content

  • May 11, 2017
    Lindsay zips-up lane closure solution
    Moveable barrier systems are offering engineers a new traffic management options. Work zones - be they for maintenance or road widening - are a fact of life and when they occur on major highways, they create no end of problems for traffic planners and travellers alike.
  • May 18, 2018
    Clearview launches ROI calculators for road safety schemes
    Clearview Intelligence (CI) has launched two free to use return on investment (ROI) calculators to assist highway professionals in showing the benefit of improving road safety on their network. The tools are said to demonstrate how road safety schemes pay for themselves during their lifetime as well as quantifying the number of lives saved and injuries prevented. Designed for both SolarLite Active Road Stud installations and for combination road safety solutions, the tools use the official costs of accident
  • September 15, 2014
    Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • July 9, 2014
    Work starts on more UK smart motorways
    Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced. Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey. The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to U