Skip to main content

Clearview Traffic shortlisted for two Highways Excellence Awards

Clearview Traffic Group has been shortlisted in two different categories for the Highways Magazine Excellence Awards 2012, with two diverse road delineation projects. In the Road Marking Project of the Year category, the company has been chosen as a finalist for its dynamic delineation project for the Hindhead Tunnel in Surrey, UK, where Clearview installed 868 Astucia IRS2 hardwired bi-directional road studs in a project initiated by the Highways Agency (HA) in 2007 to remove a major source of congestion a
September 28, 2012 Read time: 2 mins
557 Clearview Traffic Group has been shortlisted in two different categories for the Highways Magazine Excellence Awards 2012, with two diverse road delineation projects.

In the Road Marking Project of the Year category, the company has been chosen as a finalist for its dynamic delineation project for the Hindhead Tunnel in Surrey, UK, where Clearview installed 868 Astucia IRS2 hardwired bi-directional road studs in a project initiated by the 503 Highways Agency (HA) in 2007 to remove a major source of congestion around the A3/A287 junction.

According to Clearview, the hardwired road studs not only provide superior lane delineation with all the safety benefits, but also facilitate dynamic lane marking, allowing for normal running through each bore or a contraflow situation when one bore is closed.  Under normal running every other stud, therefore every 9m, is illuminated facing the oncoming traffic, whilst during contra flow arrangements every stud is illuminated in each direction at 4.5m intervals as a ‘do not cross’  instruction. This has given the operators the flexibility they require to maximise the safe and smooth continuous flow on this critical arterial road under all operating conditions.

The company has also been shortlisted jointly with Jacobs and Telford & Wrekin Council in the Road Safety Scheme or Project of the Year, for the A41 Chetwynd road safety scheme, which aims to decrease the number of collisions and reduce speeding drivers on this hazardous section of road.

The scheme runs along a dangerous stretch of the A41 in Chetwynd and is said to be a first in the UK, using both 1875 Astucia SolarLite and IRS1 hardwired intelligent road studs together with vehicle activated signs (VAS). During the hours of darkness the junction layout is defined using the road studs, delineating the road layout and shape also highlighting the turning lanes. Approaching vehicles travelling in excess of a predetermined trigger speed illuminate the VAS and the road studs increase in brightness to further highlight the junction layout and promote speed reduction.

The awards will be announced in London at a special awards dinner on Thursday 11th October 2012.

Related Content

  • March 1, 2013
    Traffic monitoring and hard shoulder running
    Hard shoulder running is on the increase – and the detection and monitoring of incidents on affected roads is occupying the minds of experts across Europe and the US
  • August 6, 2013
    Monitoring, detection and control systems inside tunnels can do much to improve traveller safety
    ITS technology can do a great deal to improve tunnel safety, as Colin Sowman discovers. It was back in April 2004 that the European Parliament adopted the EU Directive which lays down the Minimum Safety Requirements for Tunnels in the Trans-European Road Network (2004/54/EC). This was the first unitary legislation setting minimum safety standards for European road tunnels and was designed to harmonise the management of tunnel safety at a national level. Operators of existing tunnels have until 30 April 201
  • November 1, 2013
    Section of M6 motorway to be made ‘smart’
    A section of the M6 motorway in the UK between junctions 10a and 13 is to be upgraded to a smart (managed) motorway with all-lane running. This section of the motorway is a major strategic route, carrying around 120,000 vehicles per day.
  • September 22, 2014
    FTA disappointed at Dartford free-flow toll delay
    ‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the Freight Transport Association (FTA). The Association has voiced its concern in response to the announcement by the Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks. Originally planned to be in place by the 28 October 2014, th