Skip to main content

City EV selects OTI's to provide cashless payment solution for EV charging station

CityEV has chosen OTI’s Uno 6 Ultra Compact NFC Contactless Reader as the cashless payment solution for its Cityline 100 electric vehicle (EV) charging stations. The CityEV ChargePoint network is a part of a network system, with the latest protocol version offering both local and smart charging, where charging on multiple charge points is limited to a certain power limit and central smart charging which is managed by the central system.
November 21, 2017 Read time: 1 min
CityEV has chosen OTI’s Uno 6 Ultra Compact NFC Contactless Reader as the cashless payment solution for its Cityline 100 electric vehicle (EV) charging stations.

The CityEV 4825 ChargePoint network is a part of a network system, with the latest protocol version offering both local and smart charging, where charging on multiple charge points is limited to a certain power limit and central smart charging which is managed by the central system.

Shlomi Cohen, chief executive officer at OTI, said: "OTI recognizes CityEV as a major player in the plug-in hybrid electric vehicle market and is happy to be CityEV's choice for its cashless payment solution. The Uno 6 has been neatly embedded into the Cityline 100 smart interface. We look forward to a prosperous future in the electric vehicle market with CityEV and its Cityline 100 system."

For more information on companies in this article

Related Content

  • Smart Card Alliance white paper explores possibilities for NFC in transit industry
    March 14, 2012
    With near field communication (NFC)-enabled handsets poised to exceed 100 million in 2012, the Smart Card Alliance Transportation Council has announced a new white paper examining how the transit industry can best make use of this popular new technology.
  • WIM industry ponders certification challenge
    April 29, 2019
    It’s hard to pin down the world of Weigh in Motion. Adam Hill asks five of the sector’s leading players about current developments – and whether problems with certification will ever be solved
  • IRF World Congress 2024: moving ahead
    October 22, 2024
    On the last day of the three-day IRF World Congress 2024 in Istanbul, attendees heard what can work best, what can be improved and what the future might hold for those pursuing sustainable goals. David Arminas reports.
  • Road usage charge pilot under way
    November 22, 2012
    The Oregon Department of Transportation (ODOT) is undertaking a pilot project to test the next generation of a road usage charge system designed to address funding gaps caused by a rise in fuel efficiency and a decline in gas tax revenue. Around forty volunteers have begun testing the new system, where, instead of paying the gas tax, automatically added at the pump, pilot participants will pay a per mile charge based on the number of miles they drive. The charge is roughly equal to the amount of gas tax the