Skip to main content

Chile plans feasibility studies to extend three metro lines

Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago. The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo. The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the
March 14, 2014 Read time: 2 mins
Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago.

The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo.

The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the city, he added.

Metro de Santiago is currently building the 22 kilometre-long line 3, which will have 18 stations between Ñuñoa in eastern Santiago and Huechuraba in the north of the city and is budgeted at US$1.72 billion. The line will pass through six municipalities and serve some 660,000 residents.

Metro is also building line 6, a US$1.06 billion project that will run 15.3 kilometre from Providencia to Cerrillos in the west and have 10 stations. It will pass through eight municipalities and serve 870,000 residents.

Former president Sebastián Piñera's administration launched a master plan to invest US$22.5 billion in transport infrastructure in Santiago until 2025, with emphasis on metro, rail and roads. The plan includes investments of US$10.9 billion in metro and rail projects over the next 11 years, when the number of urban residents is expected to have risen by 11 per cent to 7.3 million and the number of cars to double to 2.65 million.

Related Content

  • Thales Siemens JV wins Spanish high speed rail contract
    August 17, 2015
    Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar
  • Anywhere card delivers prepaid contactless ticketing
    January 25, 2012
    David Crawford investigates a far reaching initiative in integrated travel. The Port Authority Transit Corporation (PATCO), an operator of high speed commuter rail in the north eastern US, is not one of the world's best known transit providers. Its 13 stations along a single east-west route (three of them interchanges with other regional commuter lines) handle 40,000 passengers a day, travelling to and from Philadelphia, the US' fifth most populous city.
  • Infrastructure projects to drive the construction industry in Norway
    August 7, 2015
    According to a recent report by Timetric’s Construction Intelligence Center (CIC), Norway’s construction industry will continue to expand over the coming five years, with investment in transport infrastructure projects continuing to drive growth. Under the government’s fourth National Transport Plan (NTP) 2014–2023, a series of infrastructure projects will be launched with an investment of around US$86.5 billion. The Norwegian Ministry of Transport and Communications has proposed total investment in th
  • Thales scoops Hong Kong signalling contract
    September 5, 2013
    Thales has been awarded a contract by Hong Kong’s metro operator, MTR Corporation, to provide signalling technology for Shatin to Central Link Phase 1 segment of the Hong Kong metro using a communications-based train control (CBTC) system. To provide fully automatic train operation the contract includes the modernisation of the Ma On Shan Line and West Rail Line lines, where Thales previously installed its CBTC solution in 2003/04.