Skip to main content

Chile plans feasibility studies to extend three metro lines

Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago. The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo. The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the
March 14, 2014 Read time: 2 mins
Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago.

The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo.

The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the city, he added.

Metro de Santiago is currently building the 22 kilometre-long line 3, which will have 18 stations between Ñuñoa in eastern Santiago and Huechuraba in the north of the city and is budgeted at US$1.72 billion. The line will pass through six municipalities and serve some 660,000 residents.

Metro is also building line 6, a US$1.06 billion project that will run 15.3 kilometre from Providencia to Cerrillos in the west and have 10 stations. It will pass through eight municipalities and serve 870,000 residents.

Former president Sebastián Piñera's administration launched a master plan to invest US$22.5 billion in transport infrastructure in Santiago until 2025, with emphasis on metro, rail and roads. The plan includes investments of US$10.9 billion in metro and rail projects over the next 11 years, when the number of urban residents is expected to have risen by 11 per cent to 7.3 million and the number of cars to double to 2.65 million.

Related Content

  • Egis, Systra to carry out design studies for Medina metro
    March 16, 2015
    The Medina Metro Development Authority (MMDA) has awarded Egis, in association with Systra, a contract to carry out the design studies for the future metro network in Medina. The contract covers three lines (green, blue, red) stretching a total of 95 kilometres, including 25 kilometres underground and 48 kilometres overhead. The project is part of an ambitious plan initiated over the past few years by Saudi Arabia to develop and modernise its transport infrastructure. As the second holy city in the country,
  • Thailand to spend over US$19 billion for six more MRT rail lines
    August 24, 2012
    The Mass Rapid Transit Authority (MRTA) of Thailand is to make immediate plans to develop six additional mass rapid transit (MRT) rail lines that should be operational by 2020. The lines will measure a length of 200 kilometres and entail US$19.16 billion in combined investments. The move was spurred by a forecast that suggests some three million passengers a day will use the MRT rail system in Bangkok by 2020.
  • Thales signs deals with China, Korea, Turkey
    June 15, 2020
    French firm closes three signal control contracts for urban rail systems
  • Running on empty
    May 2, 2018
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate