Skip to main content

Chile plans feasibility studies to extend three metro lines

Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago. The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo. The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the
March 14, 2014 Read time: 2 mins
Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago.

The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo.

The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the city, he added.

Metro de Santiago is currently building the 22 kilometre-long line 3, which will have 18 stations between Ñuñoa in eastern Santiago and Huechuraba in the north of the city and is budgeted at US$1.72 billion. The line will pass through six municipalities and serve some 660,000 residents.

Metro is also building line 6, a US$1.06 billion project that will run 15.3 kilometre from Providencia to Cerrillos in the west and have 10 stations. It will pass through eight municipalities and serve 870,000 residents.

Former president Sebastián Piñera's administration launched a master plan to invest US$22.5 billion in transport infrastructure in Santiago until 2025, with emphasis on metro, rail and roads. The plan includes investments of US$10.9 billion in metro and rail projects over the next 11 years, when the number of urban residents is expected to have risen by 11 per cent to 7.3 million and the number of cars to double to 2.65 million.

Related Content

  • Copenhagen light rail JV appointed
    February 13, 2015
    Copenhagen metro operator Metroselkabet has appointed Arup as part of a joint venture with Rambøll to develop the light rail on ring 3 for greater Copenhagen. The new light rail system includes a double track alignment of 27 kilometres and 27 stations with a rolling stock fleet of 27 light rail vehicles. This major project was planned to promote the use of public transport as well as encourage the urban development along the route and the passage across the city to avoid interchanging in the centre.
  • London's shared bikes go electric
    September 12, 2022
    TfL's Santander Cycles scheme adds 500 e-bikes in UK capital and changes fare structure
  • Perth unveils light rail plans
    September 4, 2012
    In Australia, Perth state government has unveiled its plans for a light rail network to relieve traffic congestion in Perth. The government is proposing a 22 kilometre light rail line linking the central business district to the northern suburbs and running alongside some of the city's busiest roads.
  • Metro to slash greenhouse gas in Washington
    May 1, 2019
    The Washington Metropolitan Area Transit Authority (Metro) has introduced a five-year Energy Action Plan to reduce energy usage and cut greenhouse gas emissions in the US capital. Once fully implemented, it is expected to net $16 million annually in energy cost savings and another $13 million in savings on operations and maintenance expenses by 2025. The plan is part of a commitment by Metro to invest $65m from its capital budget by 2025 in energy efficiency technology, modernise operations and redu