Skip to main content

Chile plans feasibility studies to extend three metro lines

Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago. The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo. The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the
March 14, 2014 Read time: 2 mins
Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago.

The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo.

The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the city, he added.

Metro de Santiago is currently building the 22 kilometre-long line 3, which will have 18 stations between Ñuñoa in eastern Santiago and Huechuraba in the north of the city and is budgeted at US$1.72 billion. The line will pass through six municipalities and serve some 660,000 residents.

Metro is also building line 6, a US$1.06 billion project that will run 15.3 kilometre from Providencia to Cerrillos in the west and have 10 stations. It will pass through eight municipalities and serve 870,000 residents.

Former president Sebastián Piñera's administration launched a master plan to invest US$22.5 billion in transport infrastructure in Santiago until 2025, with emphasis on metro, rail and roads. The plan includes investments of US$10.9 billion in metro and rail projects over the next 11 years, when the number of urban residents is expected to have risen by 11 per cent to 7.3 million and the number of cars to double to 2.65 million.

Related Content

  • March 16, 2022
    Indra upgrades ticketing in Chile 
    Indra is to deploy new ticket validators modelled after those installed on the bus network
  • March 11, 2013
    Thailand expands transportation infrastructure
    The Thai government is expanding its current transportation systems with plans for 55 transportation projects worth US$72 billion which are expected to be completed by 2020. Of the US$72 billion, 64 percent will be spent on 31 rail projects, 24 per cent on 13 road projects, 7 per cent for seven water transportation projects, and 4.75 per cent is for four air transportation projects. These projects are designed to make Thailand a crossroads for the ASEAN logistics network, enabling cities in the region to be
  • March 30, 2016
    Siemens to equip new metro line in Sofia
    Metropolitan EAD, the metro operator in Sofia, Bulgaria, has commissioned a consortium of Siemens and the Polish train manufacturer Newag to equip the new metro line 3 in the city, which will create an 18 kilometre east-west link that will serve 18 stations. The order, valued at around US$158 million (EUR140 million), comprises the delivery of 20 Inspiro type metro trains and the Trainguard MT automatic train protection system, using wireless CBTC technology (communications-based train control) to provid
  • January 23, 2015
    Alstom wins new Kochi metro line contracts
    Alstom has been awarded two contracts worth over US$73 million by Delhi Metro Rail Corporation (DMRC) to supply signalling, telecom and electrification solutions for the new Kochi metro line. The projects will be implemented in early 2016 and commercial service is scheduled to begin in March 2016. The contracts include 25 Alstom Metropolis trains which will circulate on the new Kochi metro line which is 25 kilometres long and includes 22 stations. These trains will carry up to 15,000 passengers per hour