Skip to main content

Chile plans feasibility studies to extend three metro lines

Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago. The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo. The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the
March 14, 2014 Read time: 2 mins
Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago.

The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo.

The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the city, he added.

Metro de Santiago is currently building the 22 kilometre-long line 3, which will have 18 stations between Ñuñoa in eastern Santiago and Huechuraba in the north of the city and is budgeted at US$1.72 billion. The line will pass through six municipalities and serve some 660,000 residents.

Metro is also building line 6, a US$1.06 billion project that will run 15.3 kilometre from Providencia to Cerrillos in the west and have 10 stations. It will pass through eight municipalities and serve 870,000 residents.

Former president Sebastián Piñera's administration launched a master plan to invest US$22.5 billion in transport infrastructure in Santiago until 2025, with emphasis on metro, rail and roads. The plan includes investments of US$10.9 billion in metro and rail projects over the next 11 years, when the number of urban residents is expected to have risen by 11 per cent to 7.3 million and the number of cars to double to 2.65 million.

Related Content

  • Smart phones offer smarter way to pay for travel
    December 16, 2013
    David Crawford reviews developments in near field communications for mass transit payments. ‘A carefully-designed and well-implemented mobile near field communications (NFC) solutions can give passengers a compelling experience that will encourage them to make greater use of public transport.’ That was the confident conclusion of a recent joint White Paper drawn up by the International Association of Public Transport and the global mobile operators’ representative group GSMA.
  • Work begins on major southern Vietnam bridge
    October 25, 2013
    Construction has begun on two-kilometre bridge spanning the Tien River in the Mekong Delta in southern Vietnam. The investment of US$145 million is funded by non-refundable aid from the Australian government, a loan from the Asia Development Bank and Vietnamese government capital. The cable-stayed Cao Lanh Bridge, which links Cao Lanh Town and Lap Vo District in Dong Thap Province, will have four lanes for motorised vehicles to run at a speed of 80 kilometres per hour and two other lanes for non-motoris
  • Delhi uses waste-to-energy to power metro line
    June 13, 2019
    Delhi Metro Rail Corporation (DMRC) has announced it is receiving power generated from a waste-to-energy plant to operate the Pink Line metro service in the Indian capital. DMRC says it is currently receiving 2 megawatts (MW) of power from East Delhi Waste Processing Company’s (EDWPCL) 12 MW capacity plant located in the town of Ghazipur. EDWPCL’s waste-to-energy plant was realised from an agreement with the government of Delhi and the East Delhi Municipal Corporation. The facility is expected to pro
  • Auckland’s Waterview Tunnel to open
    June 22, 2017
    Construction work on Auckland’s US 1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July.