Skip to main content

ChargePoint America programme shipping milestone

Coulomb Technologies has announced the completion of more than 2,400 shipments of its public and commercial charging stations for electric vehicles through its ChargePoint America programme. The company claims it has seen exceptional demand in all 10 regions of the programme and is finalising the installation of charging stations within these regions.
April 11, 2012 Read time: 1 min
4824 Coulomb Technologies has announced the completion of more than 2,400 shipments of its public and commercial charging stations for electric vehicles through its 4825 ChargePoint America programme. The company claims it has seen exceptional demand in all 10 regions of the programme and is finalising the installation of charging stations within these regions.

Coulomb’s ChargePoint America programme is providing approximately 4,500 charging stations to programme participants in ten regions in the United States: Austin/San Antonio, Texas, Boston, Los Angeles, New York, Orlando/Tampa, Sacramento, Calif., San Jose/San Francisco Bay Area, Redmond/Bellevue, Wash., Washington DC/Baltimore, Southern Michigan (including Grand Rapids, Lansing, Ann Arbor and Detroit). The programme is a strategic partnership between Coulomb and six leading automobile brands: 278 Ford, 1960 Chevrolet, 4826 Smart USA, 1731 BMW, 838 Nissan and 4827 Fisker Automotive.

The ChargePoint America programme is made possible by a US$15 million matching grant funded by the American Recovery and Reinvestment Act through the Transportation Electrification Initiative administered by the Department of Energy.

For more information on companies in this article

Related Content

  • Jacobs JV awarded contract for California high speed rail
    July 23, 2015
    The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
  • Bird app - now with extra bikes
    September 27, 2021
    Micromobility group is including local bike-share providers in its app in US and Norway
  • US IntelliDrive cooperative infrastructure programme
    February 2, 2012
    The 'rebranding' of the US's Vehicle-Infrastructure Integration programme as IntelliDrive marks an effort to make the whole undertaking more accessible both in terms of nomenclature and technology. Shelley Row, director of the ITS Joint Program Office within USDOT's Research and Innovative Technology Administration, talks about the changes
  • ITS America 2013 Article Page
    January 12, 2013
    ITS America 2013 Article Page