Skip to main content

ChargePoint America programme shipping milestone

Coulomb Technologies has announced the completion of more than 2,400 shipments of its public and commercial charging stations for electric vehicles through its ChargePoint America programme. The company claims it has seen exceptional demand in all 10 regions of the programme and is finalising the installation of charging stations within these regions.
April 11, 2012 Read time: 1 min
4824 Coulomb Technologies has announced the completion of more than 2,400 shipments of its public and commercial charging stations for electric vehicles through its 4825 ChargePoint America programme. The company claims it has seen exceptional demand in all 10 regions of the programme and is finalising the installation of charging stations within these regions.

Coulomb’s ChargePoint America programme is providing approximately 4,500 charging stations to programme participants in ten regions in the United States: Austin/San Antonio, Texas, Boston, Los Angeles, New York, Orlando/Tampa, Sacramento, Calif., San Jose/San Francisco Bay Area, Redmond/Bellevue, Wash., Washington DC/Baltimore, Southern Michigan (including Grand Rapids, Lansing, Ann Arbor and Detroit). The programme is a strategic partnership between Coulomb and six leading automobile brands: 278 Ford, 1960 Chevrolet, 4826 Smart USA, 1731 BMW, 838 Nissan and 4827 Fisker Automotive.

The ChargePoint America programme is made possible by a US$15 million matching grant funded by the American Recovery and Reinvestment Act through the Transportation Electrification Initiative administered by the Department of Energy.

For more information on companies in this article

Related Content

  • Nissan and Enel launch vehicle-to-grid project in the UK
    May 12, 2016
    Automotive manufacturer Nissan and multinational power company Enel are to launch a major vehicle-to-grid (V2G) trial in the UK, which will see one hundred V2G units installed and connected at locations agreed by private and fleet owners of the Nissan LEAF and e-NV200 electric van. By giving Nissan electric vehicle owners the ability to plug their vehicles into the V2G system, owners will have the flexibility and power to sell stored energy from their vehicle battery back to the National Grid. The annou
  • Congestion pricing: the time to act is now
    August 20, 2024
    New York may have thrown a curveball on congestion pricing, but it is a proven global strategy for traffic management which cities should adopt, argues Wes Guckert of The Traffic Group
  • Lime links with SafeUp in US
    December 2, 2021
    Community network can use free micromobility options to get to women who feel unsafe
  • 2012 US Urban Mobility Report published
    February 8, 2013
    Researchers at the Texas A&M Transportation Institute (TTI) have come up with a way to measure the unreliability of trip times due to traffic congestion. The Planning Time Index (PTI) illustrates the amount of extra time needed to arrive on time for higher priority events, such as an airline departure, just-in-time shipments, medical appointments or especially important social commitments. If the PTI for a particular trip is 3.00, a traveller would allow sixty minutes for a trip that typically takes twenty