Skip to main content

Cenex conduct EV feasibility study in Northern Wales, UK

Transport and energy consultancy, Cenex has been appointed by Cadwyn Clwyd (CC), a Rural Development Agency, and Wrexham County Borough Council (WCBC), to determine the feasibility of installing electric charging points across the county of Wrexham. The work is aimed at promoting the uptake of plug-in electric vehicles (EVs) in and around the area. Funding for the project has come from the Welsh Government Rural Communities - Rural Development Programme 2014-2020, which is funded by the European
November 9, 2017 Read time: 2 mins

Transport and energy consultancy, Cenex has been appointed by Cadwyn Clwyd (CC), a Rural Development Agency, and Wrexham County Borough Council (WCBC), to determine the feasibility of installing electric charging points across the county of Wrexham. The work is aimed at promoting the uptake of plug-in electric vehicles (EVs) in and around the area.

Funding for the project has come from the Welsh Government Rural Communities - Rural Development Programme 2014-2020, which is funded by the European Agricultural Fund for Rural Development and the Welsh Government.

The study is due to take place from October 2017 to December 2017. Cenex will use its in-house knowledge in infrastructure planning and procurement framework. It will identify the most suitable locations for the installation of charging points as well as the most suitable type of charging point per location. In addition, it will establish the suitability of using renewable technology for powering and charging of the charge points. Cenex will also consider options for public access, and provide recommendations for the most cost-effective and most suitable charging points for areas across the County.
 
Donna Hughes, CC business partnerships officer, said: “We (WCBC and CC) have identified that it is becoming increasingly necessary to provide greener infrastructure within Wrexham County, to meet the rising demand for electric vehicles.  This feasibility study is the first step in addressing the need for public use charging points, giving visitors and residents the confidence that they can travel to, and within the county.”

Related Content

  • ITS America & Nema publish procurement guidance
    July 14, 2025
    Outcomes-based contracting reflects digitalisation and other changes
  • London’s strategy to tackle air quality problems
    October 21, 2014
    Colin Sowman talks to Matthew Pencharz, the man charged with charting London’s path between catering for traveller needs, conserving ancient buildings and conforming to modern air quality standards.
  • CDOT launches road usage charge pilot research program
    November 18, 2016
    The Colorado Department of Transportation (CDOT) has explored a number of ways to find sustainable road funding. It is facing a nearly US$1 billion annual funding gap over the next 25 years and is looking to explore transportation funding alternatives as the fuel tax continues to become less reliable over time, due decreased purchasing power and more fuel efficient and electric vehicles. This pilot is the first step in an extensive process of evaluating the concept alongside other funding alternatives. I
  • The sunshine subsidy for Colorado’s tollways
    January 10, 2014
    David Crawford reports on energy cost cutting on US highways. Just over a year after switch-on and with two global awards under its belt, the longest solar-powered toll road in the US is generating heightened interest in highway applications of alternative energy. The E-407, which loops around the eastern perimeter of the Denver metropolitan area in Colorado, won the International Bridge, Tunnel and Turnpike Association (IBTTA) President’s Overall Award for Excellence at its September 2013 Annual Meeting in