Skip to main content

Canada’s DRT chooses Init fleet management

ITS solutions provider Init is to install an inter-modal fleet management system for Canada’s Durham Region Transit (DRT), Toronto. DRT has a fixed route fleet of 205 vehicles which includes twenty-six Pulse Bus Rapid Transit (BRT) vehicles. Init is to replace DRT’s existing scheduling software and will also supply onboard computers, touchscreen driver terminals, planning software, statistics and reporting software and onboard passenger information displays and announcements. Init will also install automat
May 1, 2013 Read time: 2 mins
Init Durham Transit
ITS solutions provider 511 INIT is to install an inter-modal fleet management system for Canada’s Durham Region Transit (DRT), Toronto.  DRT has a fixed route fleet of 205 vehicles which includes twenty-six Pulse Bus Rapid Transit (BRT) vehicles.

Init is to replace DRT’s existing scheduling software and will also supply onboard computers, touchscreen driver terminals, planning software, statistics and reporting software and onboard passenger information displays and announcements.

Init will also install automated passenger counting technology on the Pulse BRT vehicles, enabling DRT to capture accurate data for reporting and analysis and allow them to make service adjustments and allocate resources.  Init says its Iris passenger counting sensors will provide DRT with a 98 per cent passenger counting accuracy rate.

Init’s onboard driver touch terminal will simplify and improve driver processes, and provide communications between vehicles and DRT’s control centre.

The new system will also interface with DRT’s existing signs and fare collection systems, allowing easy integration with existing equipment.

Related Content

  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • January 26, 2012
    Vancouver's metro transport promotes alternatives to driving
    David Crawford looks at Vancouver and the legacy of a Olympic transport success
  • January 12, 2022
    GMV tech enhances Granada bus travel 
    Passengers in Spanish city can pay using contactless cards, QR codes and EMV cards 
  • July 17, 2012
    Metrolinx opts for INIT system
    GO Transit, a division of Metrolinx, located in Toronto, Canada, that carries 61 million passengers a year has chosen INIT to deploy a new fleet management system for 424 GO buses, 47 GO rail cars and 50 non-revenue vehicles. The contract calls for an advanced ITS solution which includes an intermodal CAD/AVL system, on-board mobile data terminals, automatic passenger counting technology, next stop announcements, in-vehicle variable message signs, real-time vehicle diagnostics and interfaces to existing des