Skip to main content

Call for RFID tags on European trains

According to Juliette van Driel of Dutch government organisation ProRail, who is to speak on the subject at the Rail Technology Conference in Paris in November, there is a requirement for identification tags on European trains. Radio frequency identification (RFID) tags enable the monitoring and tracking of the separate components of a wagon, such as axles and wheels, over time. This enables the early identification of locomotive, carriage and wagon defects and the prevention of derailments. “It’s imp
September 9, 2015 Read time: 2 mins
According to Juliette van Driel of Dutch government organisation ProRail, who is to speak on the subject at the Rail Technology Conference in Paris in November, there is a requirement for identification tags on European trains.

Radio frequency identification (RFID) tags enable the monitoring and tracking of the separate components of a wagon, such as axles and wheels, over time. This enables the early identification of locomotive, carriage and wagon defects and the prevention of derailments.

“It’s important because the freight transporters particularly cross the borders. You don’t want to raise any more barriers with national legislation, that’s why this needs to be a European regulation,” says van Driel.

ProRail currently use two systems to monitor train axels and wheels: Hotbox Detection and Wheel Impact Load Detection (WILD). Hotbox Detection measures if train axels are getting too hot. Overheating can cause jamming or breakage, which can result in the derailing of trains. If the axles or wheels get too hot, a signal is sent to the train’s service leader, who calls the operator, and the operator brings the train to a halt.

WILD is much more widely used than Hotbox Detection, says van Driel. “This system measures the dynamic and static power of the axels and wheels. If these are too high, we stop the train. With the train derailment in Borne, for example, high dynamic power had also occurred. If the carrier had been able to use this information, the derailment could have been prevented.”

In November 2013, a loaded freight train’s wagon derailed in Borne. Approximately four kilometres of track were badly damaged by this derailment. Repairs cost around 2.5 million euros and lasted several days.

According to van Dreil, RFID tags would provide maintenance information for each wagon, enabling operators to schedule maintenance to prevent breakdowns. “You want to prevent problem,” she says. You want to have maintenance scheduled before you reach the point where train parts break down. This is important for the longevity of the equipment, but also for track safety. Without an RFID tag, the details only come in based on the train number and it is difficult for the operator to identify which wagon it refers to.”

Related Content

  • Urban tunnel replaces viaduct, improves safety
    October 10, 2012
    Earthquake sensors, automatic barriers and real time monitoring systems are all part of a scheme to make a major Seattle traffic artery safer, by taking it underground. Huw Williams reports. Seattle’s metropolitan area of 3.5 million people, like much of the western seaboard of the United States, lies in an earthquake zone. In Seattle’s case, the city and its hinterland sit atop a complex network of interrelated active geological faults capable of severe seismic activity and posing complex considerations fo
  • Melbourne uses big data to transform tram services
    November 7, 2013
    In Australia, Melbourne's Yarra Trams, the largest tram system in the world, is dramatically improving service on its 250 kilometres of double tracks. By using IBM big data, the cloud, mobile and analytics the company is able to reconfigure routes on the fly, pinpoint and fix problems before they occur, and respond quickly to challenges, whether it's sudden flooding, major events in the city, or just rush hour traffic. As a result, the iconic 100-year old system is consistently beating its own service
  • Kistler helps apply full weight of the law
    June 26, 2025
    Kistler says its KiTraffic Digital WiM system is improving commercial vehicle overload inspections in Switzerland
  • Is it time for a harmonised international standard for Weigh in Motion?
    May 15, 2024
    Weigh in Motion vendors are frustrated that OIML accreditation is not proving to be enough to satisfy tenders in some countries. In this article, the board of the International Society for Weigh in Motion suggests a possible way forward…