Skip to main content

California's high-speed-rail project goes ahead

The California Supreme Court decided last week not to consider an appeal of a case brought by opponents of the state’s $68 billion bullet train project, paving the way for the project to go ahead. Opponents had questioned whether the California High-Speed Rail Authority was complying with the terms of the ballot measure that funded the project. The appellate court agreed there are legitimate legal concerns about whether the “high-speed rail project the California High-Speed Rail Authority seeks to bui
October 20, 2014 Read time: 2 mins
The California Supreme Court decided last week not to consider an appeal of a case brought by opponents of the state’s $68 billion bullet train project, paving the way for the project to go ahead.

Opponents had questioned whether the California High-Speed Rail Authority was complying with the terms of the ballot measure that funded the project.

The appellate court agreed there are legitimate legal concerns about whether the “high-speed rail project the California High-Speed Rail Authority seeks to build is the project approved by the voters” but said the arguments were brought too soon.

Dan Richard, chairman of the board that oversees the high-speed rail project, said in a written statement that the state will move aggressively to build the system.

Demolition work and construction testing has already begun around Fresno, one of the hubs on the first 28-mile stretch in the Central Valley.

The decision concerns only one portion of the plaintiffs’ lawsuit. In a second phase still before the Sacramento County judge, attorneys will argue that compromises made to cut the price mean the bullet train won’t be able to travel from San Francisco to Los Angeles in two hours and 40 minutes as promised in the ballot measure.

Related Content

  • Siemens tests eHighway system
    August 7, 2014
    Siemens, in conjunction with Volvo, is to trial an eHighway system on a two-mile stretch of highway in California in the vicinity of the ports of Los Angeles and Long Beach. The company was awarded the contract by Southern California’s South Coast Air Quality Management District (SCAQMD) with the objectives of eliminating local emissions, reducing the consumption of fossil fuels and cutting the operating costs of trucks. The two ports are seeking an emission-free solution, Zero Emission I-710 Project, for a
  • Sandra Phillips of Movmi: ‘We’re all trying to get people moving without a car’
    April 30, 2021
    Movmi founder Sandra Phillips talks to Adam Hill about why transport integration is sometimes a matter of trust – and how to empower women in transportation
  • Study ranks accessibility to jobs by transit in top US cities
    October 10, 2014
    New research from the Accessibility Observatory at the University of Minnesota ranks 46 of the 50 largest (by population) metropolitan areas in the US for accessibility to jobs by transit. The new rankings, part of the Access Across America study begun last year, focus on accessibility, a measure that examines both land use and transportation systems. Accessibility measures how many destinations, such as jobs, can be reached in a given time. In the study, rankings were determined by a weighted average
  • Plug and play approach unifies workzone ITS
    July 18, 2012
    Caltrans District 7 is finalising a ConOps document which will detail a plug-and-play to work zone ITS operation. The organisation's Allen Z. Chen elaborates. Before August is out, on current planning, the California Department of Transportation (Caltrans) District 7 (which covers Los Angeles and Ventura Counties, with a combined population of close to 11 million people) intends to have finalised a Concept of Operations (ConOps) document dealing with Work Zone Transportation Management Systems (WZTMS). The