Skip to main content

California's high-speed-rail project goes ahead

The California Supreme Court decided last week not to consider an appeal of a case brought by opponents of the state’s $68 billion bullet train project, paving the way for the project to go ahead. Opponents had questioned whether the California High-Speed Rail Authority was complying with the terms of the ballot measure that funded the project. The appellate court agreed there are legitimate legal concerns about whether the “high-speed rail project the California High-Speed Rail Authority seeks to bui
October 20, 2014 Read time: 2 mins
The California Supreme Court decided last week not to consider an appeal of a case brought by opponents of the state’s $68 billion bullet train project, paving the way for the project to go ahead.

Opponents had questioned whether the California High-Speed Rail Authority was complying with the terms of the ballot measure that funded the project.

The appellate court agreed there are legitimate legal concerns about whether the “high-speed rail project the California High-Speed Rail Authority seeks to build is the project approved by the voters” but said the arguments were brought too soon.

Dan Richard, chairman of the board that oversees the high-speed rail project, said in a written statement that the state will move aggressively to build the system.

Demolition work and construction testing has already begun around Fresno, one of the hubs on the first 28-mile stretch in the Central Valley.

The decision concerns only one portion of the plaintiffs’ lawsuit. In a second phase still before the Sacramento County judge, attorneys will argue that compromises made to cut the price mean the bullet train won’t be able to travel from San Francisco to Los Angeles in two hours and 40 minutes as promised in the ballot measure.

Related Content

  • Go-ahead for Richmond-to-Raleigh high-speed rail proposal
    September 21, 2015
    The US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured. The 162-mile route between the two cities would utilise existing
  • Los Angeles highway closure fears prove groundless
    April 19, 2012
    Fears that the closure of a heavily congested stretch of highway in the US city of Los Angeles would lead to massive gridlock over the weekend proved groundless. The demolition of the Mulholland Overpass crossing above I-405 required a 53 hour closure of the busy highway along a 16km stretch. The highway carries amongst the heaviest traffic volumes of any stretch of road in the US and there has been concern that the necessary closure would cause chaos on the city as the inhabitants rely heavily on passenger
  • Texas, Oklahoma move to interoperable tolling
    April 25, 2013
    Electronic toll systems in Texas and Oklahoma could be interoperable as soon as 2014, according to toll authorities from both states. Moves to link tolling systems in Texas and Oklahoma will enable drivers with Texas tolling accounts or Oklahoma turnpike accounts to travel on the other state’s toll roads using their current toll tags. The tolls would be automatically billed to the out-of-state driver’s account. “Oklahoma Governor Mary Fallin said it would be good to have interoperability with other states,
  • Measuring vehicle lengths with a single loop - promising results
    July 27, 2012
    District 7 of Caltrans has been conducting trials to see whether the use of a single inductive loop to measure vehicle lengths and so identify heavy trucks is feasible. So far, the results have been very promising, according to Lead Transportation Engineer Steve Malkson. Between them, the adjoining ports of Los Angeles and Long Beach, the US's two biggest, cover some 10,700 acres (43km2) and 68 miles (109km) of waterfront.