Skip to main content

California aims to generate electric power from traffic congestion

California is planning a US$2.3 million initiative that will generate electrical power from traffic, according to the San Francisco Chronicle. The California Energy Commission recently voted to fund two piezoelectricity projects, which convert pressure into power. One pilot will test a 200-foot-long piece of asphalt on UC-Merced’s campus, which is designing a 200-foot stretch of asphalt that will be sowed with inch-wide piezoelectric generators, which will be stacked within arrays below the road where it is
April 20, 2017 Read time: 2 mins
California is planning a US$2.3 million initiative that will generate electrical power from traffic, according to the San Francisco Chronicle. The 4259 California Energy Commission recently voted to fund two piezoelectricity projects, which convert pressure into power.


One pilot will test a 200-foot-long piece of asphalt on UC-Merced’s campus, which is designing a 200-foot stretch of asphalt that will be sowed with inch-wide piezoelectric generators, which will be stacked within arrays below the road where it is hoped they will convert the force of passing cars into a small electrical charge.

The resulting electricity could be used to power nearby lights and signs, stored in batteries or sent to the grid, Sun said. The more traffic there is, and the heavier the vehicles are, the more power can be created. Some state estimates suggest that just 400 cars an hour would need to pass over the arrays to make them economically viable.

The second experiment will be built by the San Jose green technology company Pyro-E. The company's technology is expected to generate enough power to supply 5,000 homes using less than a half-mile of piezoelectric highway.

Both pilot programs are expected, within two to three years, to be able to give California officials an idea whether the effort should be expanded. By developing new technologies like piezoelectricity, the Energy Commission is looking to help meet the Legislature’s target of producing 50 per cent of the state’s power from renewable sources by 2030.

For more information on companies in this article

Related Content

  • Increased use of bio-fuels would enable Finland to achieve EU emissions goals
    June 16, 2014
    Finland’s technical research centre VTT and the Government Institute for Economic Research (VATT) have completed a study commissioned by the Ministry of Employment and the Economy and the Ministry of the Environment, assessing the impact of the EU's 2030 Climate and Energy Framework on Finland's energy system and national economy. The increased use of second-generation bio-fuels in road transport would provide Finland with the most cost-effective way of achieving the greenhouse gas emissions goals presente
  • Boost for EV charging in Canada
    July 24, 2017
    Canada's electric vehicle industry is about to receive a major boost with the announcement of an agreement between eCAMION, based in Toronto, Dallas-based Leclanché North America, part of Switzerland's Leclanché and SGEM based in Geneva, to develop and install a network of 34 fast-charging stations along the Trans-Canada Highway (TCH). The project, designed to encourage the adoption of electric vehicles (EVs) in Canada, is being partially funded Natural Resources Canada (NRCan) under the Canadian Energy Inn
  • UK research team aims to develop smart electric vehicle car park
    March 3, 2017
    Cenex, the UK’s first Centre of Excellence for low carbon and fuel cell technologies, is to be part of the team carrying out a project to establish the feasibility of turning a Solihull car park into a MW-scale battery to provide power on demand to the electricity grid. Part funded by Innovate UK, the UK’s innovation agency, the 12-month Net-Form project seeks to develop a secure, dynamic data management platform that collects, aggregates and optimises energy collected by large populations of grid-connected
  • New system expedites border crossings
    October 28, 2016
    Enforcing border controls can create long queues for travellers, David Crawford looks at potential solutions. Long delays at border crossings in both North America and Europe have sparked the development of new queue visualisation and management technologies that are cutting hours, even days, off international passenger and freight journeys. At the westernmost end of the 2,019km (1,250 mile) Mexico–US frontier, two parallel crossings between Tijuana, in the former country, and the border city of San Diego,