Skip to main content

BYD to build autonomous monorail system in Brazil

BYD is to build its SkyRail autonomous monorail in Brazil to connect Salvador’s central business district with São João Island. SkyRail will operate along a 20km track with a capacity of 150,000 passengers per day. The route will be partially built over the sea and offer connections with the city’s subway system. Stella Li, senior vice president of BYD and president of BYD Motors, says SkyRail will offer a zero-emission mode of transport for people living in Salvador. The project will become part
February 20, 2019 Read time: 1 min
5445 BYD is to build its SkyRail autonomous monorail in Brazil to connect Salvador’s central business district with São João Island.


SkyRail will operate along a 20km track with a capacity of 150,000 passengers per day. The route will be partially built over the sea and offer connections with the city’s subway system.

Stella Li, senior vice president of BYD and president of BYD Motors, says SkyRail will offer a zero-emission mode of transport for people living in Salvador.

The project will become part of the city’s light vehicle transport system, which is scheduled to begin construction within six months and will be fully operational by 2021.

SkyRail was launched in October 2016 following five years of research and development. It is currently operational in the western Chinese city of Yinchuan.

Related Content

  • December 19, 2013
    First electric buses hit London’s streets
    Transport for London (TfL) and bus operator Go-Ahead London have begun a trial of the capital’s first electric buses on two routes in the city. The 12-metre single deck buses were built by Chinese manufacturer BYD Auto have zero tail pipe emissions, resulting in lower carbon emissions. The trial will help TfL develop plans for greater use of electric buses in central London in the future, supporting the Mayor’s vision of a central London Ultra Low Emission Zone. The trial will be used to establish wh
  • October 28, 2016
    New system expedites border crossings
    Enforcing border controls can create long queues for travellers, David Crawford looks at potential solutions. Long delays at border crossings in both North America and Europe have sparked the development of new queue visualisation and management technologies that are cutting hours, even days, off international passenger and freight journeys. At the westernmost end of the 2,019km (1,250 mile) Mexico–US frontier, two parallel crossings between Tijuana, in the former country, and the border city of San Diego,
  • February 15, 2019
    Canada invests in Vancouver’s EV charging infrastructure
    The government of Canada is investing CAN$300,000 in the construction of six electric vehicle (EV) fast chargers in Vancouver. This funding is part of the government’s CAN$182.5m investment to develop a fast-charging network for EVs and establish natural gas stations along roads and hydrogen stations in metropolitan areas. The chargers are partially funded through the Electric Vehicle and Alternative Fuel Infrastructure Deployment Initiative, a programme which falls under Canada’s $180 billion Inves
  • April 10, 2015
    Brazil-Spain group could lose highway contract
    An engineering consortium made up of Brazil's Mendes Junior and Spain's Isolux Corsán could be stripped of its US$208 million contract to build part of the northern stretch of the Mario Covas beltway surrounding the city of São Paulo. The consortium, led by Mendes Junior, is having difficulty honouring commitments due to a lack of cash flow and, according to São Paulo state highway company Dersa, it is not completing works according to the contract schedule signed in January 2013, local paper Folha de Sã