Skip to main content

Brisbane plans underground bus loop

Plans for an underground bus loop in Brisbane’s central business district (CBD) have been released at an estimated cost of US$2 billion, as the pre-feasibility report for the project has been completed. The bus loop, part of Brisbane council’s pre-feasibility study into the Suburbs 2 City Buslink project, is intended to reduce traffic congestion and bus travel times by connecting existing bus stations with new stations underground.
September 23, 2013 Read time: 2 mins
Plans for an underground bus loop in Brisbane’s central business district (CBD) have been released at an estimated cost of US$2 billion, as the pre-feasibility report for the project has been completed.

The bus loop, part of Brisbane council’s pre-feasibility study into the Suburbs 2 City Buslink project, is  intended to reduce traffic congestion and bus travel times by connecting existing bus stations with new stations underground.

Announcing the plans, Lord Mayor Graham Quirk, said: “A one-way, underground bus loop would take buses off city streets, give drivers a simple, congestion-free run around this end of the CBD and open up opportunities for new bus infrastructure like layover bays,” says Quirk.

“The CBD and adjacent suburbs will need to accommodate an additional 130,000 workers in the next 20 years and we need to improve public transport capacity to accommodate this growth by improving the network to reduce travel times.”

Quirk says the recent announcement the Queensland Government is investigating a Brisbane underground combined rail and bus tunnel was a tremendous opportunity to address the major congestion problems that face the city’s public transport systems.

Related Content

  • Cost benefit: Wichita eases workzone congestion
    July 8, 2019
    Achieving higher diversion rates has helped one Kansas city to make traffic flow more efficient around workzones. David Crawford examines what’s behind a 10:1 benefit-to-cost ratio in Wichita Around 10% of highway congestion in the US results from delays in workzones, leading to an estimated annual loss of $700 million in fuel costs alone. The lack of accessible real-time traffic information to help motorists minimise their inconvenience – particularly at peak times - is a major contributor. One solut
  • Westminster detects disabled parking bay abuse
    March 16, 2016
    Westminster trials scheme to detect non-qualifying motorists using disabled parking bays. The provision of disabled parking bays has become commonplace - but so has the abuse of these bays by able-bodied motorists. Now, London’s Westminster City Council is running a trial of technology that detects when a vehicle is illegally parked in a disabled bay.
  • Columbia goes intermodal to support sustainability
    April 10, 2014
    David Crawford on the ups and downs of a Latin metropolis. Medellín, Colombia’s second city and a recognised leader in sustainable transport thinking, is rapidly extending its substantial existing investment in modern mobility. It is deploying both an enhanced integrated traffic management array and the country’s first intermodal public transportation management system. The supplier of both, under separate €9 million (US$12.3 million) contracts, is Spanish engineering company Indra, a major exporter
  • Transport integration separates rural idyll from remote isolation
    June 13, 2017
    David Crawford investigates the operation of Total Transport in some of Europe’s more rural areas. Total Transport is a concept that is gaining traction in Europe as a means of making it easier for people without access to a car and living in rural and remote communities, to travel to work, the shops, schools and hospitals. It involves maximising vehicle availability and integrating scheduled services with other transport services (including taxis) commissioned or contracted by more than one local governmen