Skip to main content

Brisbane plans underground bus loop

Plans for an underground bus loop in Brisbane’s central business district (CBD) have been released at an estimated cost of US$2 billion, as the pre-feasibility report for the project has been completed. The bus loop, part of Brisbane council’s pre-feasibility study into the Suburbs 2 City Buslink project, is intended to reduce traffic congestion and bus travel times by connecting existing bus stations with new stations underground.
September 23, 2013 Read time: 2 mins
Plans for an underground bus loop in Brisbane’s central business district (CBD) have been released at an estimated cost of US$2 billion, as the pre-feasibility report for the project has been completed.

The bus loop, part of Brisbane council’s pre-feasibility study into the Suburbs 2 City Buslink project, is  intended to reduce traffic congestion and bus travel times by connecting existing bus stations with new stations underground.

Announcing the plans, Lord Mayor Graham Quirk, said: “A one-way, underground bus loop would take buses off city streets, give drivers a simple, congestion-free run around this end of the CBD and open up opportunities for new bus infrastructure like layover bays,” says Quirk.

“The CBD and adjacent suburbs will need to accommodate an additional 130,000 workers in the next 20 years and we need to improve public transport capacity to accommodate this growth by improving the network to reduce travel times.”

Quirk says the recent announcement the Queensland Government is investigating a Brisbane underground combined rail and bus tunnel was a tremendous opportunity to address the major congestion problems that face the city’s public transport systems.

Related Content

  • Aurecon-Jacobs JV secures Melbourne metro contract
    July 3, 2015
    Melbourne Metro Rail Authority (MMRA) has appointed the Aurecon Jacobs Mott MacDonald (AJM) joint venture as the technical, planning and engagement advisor for the Melbourne Metro Rail Project in Victoria, Australia. The Melbourne Metro Rail Project unlocks critically needed capacity in Melbourne’s rail network and begins transforming the network into an international metro-style rail system. It includes two nine-kilometre rail tunnels from South Kensington to South Yarra as part of a new Sunbury to Cra
  • NOCoE delivers data for diligent DOTs
    April 29, 2015
    David Crawford talks to Dennis Motiani about the role of the new National Operations Centre of Excellence. Consolidating the collective experience of the US transportation system’s management and operations (TSM&O) community, streamlining its information gathering, while cutting research times and costs are the key drivers behind the country’s new National Operations Centre of Excellence (NOCoE). Launched in January at the annual meeting of the Transportation Research Board (TRB), this sets out to be a sin
  • New Mersey crossing ends Halton’s congestion misery
    December 5, 2017
    Plagued by intolerable congestion but denied government funding for its solution, tiny Halton Borough Council relentlessly pursued its vision and achieved what many believed impossible. Halton may be a small local authority in north west England, but it had a big traffic problem. However, as the road, or more particularly the bridge, involved was not deemed a strategic route, central government would not commission or even fund a solution - a problem that many other local authorities will recognise.
  • Glasgow’s new Operations Centre has a key role in city’s future
    June 6, 2014
    David Crawford investigates a control centre with a future. Destined to play a central role in keeping the city and its transport running smoothly during the 2014 Commonwealth Games in July, the new Glasgow Operations Centre in Scotland’s largest urban centre formally went live earlier this year. The aim was to dry run its far-reaching integration of previously distinct core systems and familiarise the public with the initial phase of what will be a long-term post-event legacy. The centre brings together, i