Skip to main content

Brisbane plans underground bus loop

Plans for an underground bus loop in Brisbane’s central business district (CBD) have been released at an estimated cost of US$2 billion, as the pre-feasibility report for the project has been completed. The bus loop, part of Brisbane council’s pre-feasibility study into the Suburbs 2 City Buslink project, is intended to reduce traffic congestion and bus travel times by connecting existing bus stations with new stations underground.
September 23, 2013 Read time: 2 mins
Plans for an underground bus loop in Brisbane’s central business district (CBD) have been released at an estimated cost of US$2 billion, as the pre-feasibility report for the project has been completed.

The bus loop, part of Brisbane council’s pre-feasibility study into the Suburbs 2 City Buslink project, is  intended to reduce traffic congestion and bus travel times by connecting existing bus stations with new stations underground.

Announcing the plans, Lord Mayor Graham Quirk, said: “A one-way, underground bus loop would take buses off city streets, give drivers a simple, congestion-free run around this end of the CBD and open up opportunities for new bus infrastructure like layover bays,” says Quirk.

“The CBD and adjacent suburbs will need to accommodate an additional 130,000 workers in the next 20 years and we need to improve public transport capacity to accommodate this growth by improving the network to reduce travel times.”

Quirk says the recent announcement the Queensland Government is investigating a Brisbane underground combined rail and bus tunnel was a tremendous opportunity to address the major congestion problems that face the city’s public transport systems.

Related Content

  • March 30, 2017
    Connected citizens boosts Boston’s traffic management
    Data-derived traffic management is starting to show benefits as David Crawford discovers. The city of Boston has been facing growing congestion problems in its Seaport regeneration district, with the rate of commercial and residential growth threatening to overtake the capacity of the road network to respond.
  • May 22, 2012
    New York pioneers online mobile real-time bus tracking
    An unusual technology collaboration. David Crawford investigates Early in January 2012, the New York City Metropolitan Transportation Authority (MTA) rolled out the first borough-wide implementation of its pioneering Bus Time online mobile real-time tracking service. The system allow commuters to track each bus on every route in real-time on the internet, via smartphones and by text messaging to a mobile phone. The MTA chose Staten Island for its first live launch due to it being the only one of the five Ne
  • August 4, 2015
    Thales to upgrade four London Underground lines
    French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
  • March 15, 2012
    Traffic signal priority initiatives aid better bus travel
    David Crawford investigates traffic signal priority initiatives developing for better bus travel on the US Pacific Coast Transit patronage rises by an average of 35% along commuter corridors equipped with bus rapid transit (BRT) systems, according to the US Department of Transportation’s Federal Transit Administration (FTA). BRT as defined as bus transit enhanced with ITS systems for better services, is winning new passengers attracted by opportunity to avoid increasing fuel costs and traffic congestion.