Skip to main content

Brisbane to build combined road/rail tunnel

Australia’s Queensland Government has revealed concept designs for what would be the world’s first double-deck bus and rail tunnel to replace the planned Cross River Rail project. The 15 metres wide, the US$4.6 billion underground bus and train (UBAT) tunnel would be capable of accommodating a double-track railway and two bus lanes with three underground combined bus-and-rail stations. In a statement outlining the UBAT programme, Premier Campbell Newman said: “The project we are announcing today deliver
November 22, 2013 Read time: 2 mins
Australia’s Queensland Government has revealed concept designs for what would be the world’s first double-deck bus and rail tunnel to replace the planned Cross River Rail project.

The 15 metres wide, the US$4.6 billion underground bus and train (UBAT) tunnel would be capable of accommodating a double-track railway and two bus lanes with three underground combined bus-and-rail stations.

In a statement outlining the UBAT programme, Premier Campbell Newman said: “The project we are announcing today delivers the public transport services needed for the next 50 years.”

Deputy Premier and State Development, Infrastructure and Planning Minister Jeff Seeney said: “This exciting, world-class public transport project demonstrated that the Newman Government is fulfilling its election promise to deliver better infrastructure.

“Queenslanders will have access to one of the most innovative public transport connections in the world through the underground bus and train project. The government is also progressing other transport priorities, including the Bruce Highway and the Toowoomba Second Range Crossing.”

Queensland Government has said that work could begin as early as 2015, with construction planned for completion 2020.

Related Content

  • Transport for the North gears up
    January 13, 2015
    UK Transport Secretary Patrick McLoughlin attended the inaugural Transport for the North meeting as northern leaders met to discuss their plans to transform the region into a northern powerhouse. The meeting in Leeds heralded the first step of drawing up with the government a comprehensive transport strategy to transform the north’s economic infrastructure and help maximise the region’s growth potential, rebalancing the national economy. As well as examining east-west rail links to better connect the
  • Moveble barriers improve workzone safety, reduce costs
    January 25, 2012
    Two phases of an arterial reconstruction project in Salt Lake City have provided a compelling cost-based argument for moveable barriers.
  • Lindsay zips-up lane closure solution
    May 11, 2017
    Moveable barrier systems are offering engineers a new traffic management options. Work zones - be they for maintenance or road widening - are a fact of life and when they occur on major highways, they create no end of problems for traffic planners and travellers alike.
  • Plans for new Thames crossing unveiled
    July 1, 2014
    On the 120th anniversary of the completion of London’s Tower Bridge, Arup, along with architects HOK, has unveiled its plans for a new bridge across the River Thames. The US$1 billion concept, called ‘Bridge East London’, would help transform leisure and business travel and enhance life in the east of the capital. It suggests a new road bridge over the River Thames, linking Beckton and Thamesmead at Gallions Reach. The proposed bridge would allow clear passage for ships and takes into account aircraf