Skip to main content

Brisbane to build combined road/rail tunnel

Australia’s Queensland Government has revealed concept designs for what would be the world’s first double-deck bus and rail tunnel to replace the planned Cross River Rail project. The 15 metres wide, the US$4.6 billion underground bus and train (UBAT) tunnel would be capable of accommodating a double-track railway and two bus lanes with three underground combined bus-and-rail stations. In a statement outlining the UBAT programme, Premier Campbell Newman said: “The project we are announcing today deliver
November 22, 2013 Read time: 2 mins
Australia’s Queensland Government has revealed concept designs for what would be the world’s first double-deck bus and rail tunnel to replace the planned Cross River Rail project.

The 15 metres wide, the US$4.6 billion underground bus and train (UBAT) tunnel would be capable of accommodating a double-track railway and two bus lanes with three underground combined bus-and-rail stations.

In a statement outlining the UBAT programme, Premier Campbell Newman said: “The project we are announcing today delivers the public transport services needed for the next 50 years.”

Deputy Premier and State Development, Infrastructure and Planning Minister Jeff Seeney said: “This exciting, world-class public transport project demonstrated that the Newman Government is fulfilling its election promise to deliver better infrastructure.

“Queenslanders will have access to one of the most innovative public transport connections in the world through the underground bus and train project. The government is also progressing other transport priorities, including the Bruce Highway and the Toowoomba Second Range Crossing.”

Queensland Government has said that work could begin as early as 2015, with construction planned for completion 2020.

Related Content

  • October 22, 2018
    The long road to Spanish enlightenment
    Julián Núñez, immediate past president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid. Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth: people want to avoid the pain. But pain is something that Spanish operators, including Abertis, OHL, ACS, FCC and Acciona, have been going through for the past decade. The country has
  • December 6, 2012
    New Port Mann Bridge opens to eight lanes of traffic
    Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin
  • May 13, 2016
    Kapsch awarded Toowoomba Second Range Crossing in Queensland
    Kapsch TrafficCom subsidiary Kapsch TrafficCom Australia is to deliver the roadside tolling system for the Toowoomba Second Range Crossing (TSRC) Project in Queensland, Australia. The contract, awarded by the State of Queensland, comprises supply and operation for 10 years of the roadside system for TSRC and is valued at around US$6.6 million (€6 million). Kapsch will deliver its latest tolling technology based on the company’s single gantry multi-lane free-flow platform and next-generation vision te
  • October 28, 2015
    Emissions reductions targets to have major impact on transport
    As bold moves aimed at reducing greenhouse gas emissions have been introduced in California, David Crawford looks at the ramifications for transportation. California Governor Jerry Brown’s recent dramatic raising of the bar on emissions reduction policy for the state has won him praise from Japan, Australia, Europe and the secretariat of the critical UN conference on climate change being held in Paris in November/December 2015. His April 2015 executive order aimed at bringing emissions to 40% below 1990 lev