Skip to main content

Brisbane to build combined road/rail tunnel

Australia’s Queensland Government has revealed concept designs for what would be the world’s first double-deck bus and rail tunnel to replace the planned Cross River Rail project. The 15 metres wide, the US$4.6 billion underground bus and train (UBAT) tunnel would be capable of accommodating a double-track railway and two bus lanes with three underground combined bus-and-rail stations. In a statement outlining the UBAT programme, Premier Campbell Newman said: “The project we are announcing today deliver
November 22, 2013 Read time: 2 mins
Australia’s Queensland Government has revealed concept designs for what would be the world’s first double-deck bus and rail tunnel to replace the planned Cross River Rail project.

The 15 metres wide, the US$4.6 billion underground bus and train (UBAT) tunnel would be capable of accommodating a double-track railway and two bus lanes with three underground combined bus-and-rail stations.

In a statement outlining the UBAT programme, Premier Campbell Newman said: “The project we are announcing today delivers the public transport services needed for the next 50 years.”

Deputy Premier and State Development, Infrastructure and Planning Minister Jeff Seeney said: “This exciting, world-class public transport project demonstrated that the Newman Government is fulfilling its election promise to deliver better infrastructure.

“Queenslanders will have access to one of the most innovative public transport connections in the world through the underground bus and train project. The government is also progressing other transport priorities, including the Bruce Highway and the Toowoomba Second Range Crossing.”

Queensland Government has said that work could begin as early as 2015, with construction planned for completion 2020.

Related Content

  • Smart parking trial begins in Canberra
    November 10, 2015
    The Australian Capital Territory (ACT) Government is to carry out a smart parking trial in part of Manuka starting in the first quarter of 2016. UK company Smart Parking will deliver the project using its SmartPark solution and construction is to begin in early November. A successful review of the pilot could then see further sensors installed across the rest of the city. The initial year long contract will see Smart Parking deploy 460 in-ground sensors which use infrared technology to detect when a park
  • Kapsch TrafficCom wins big in Sydney
    December 9, 2014
    The WestConnex Delivery Authority (WDA) in Sydney, Australia, has awarded Kapsch CarrierCom subsidiary, Kapsch CarrierCom Australia, the contract to supply a roadside tolling system to support capacity enhancement to the M4 motorway widening project as part of Stage 1 of the WestConnex motorway scheme in Sydney. The award covers two contracts for the initial phase of the project, one for the roadside equipment for the M4 widening segment and one for maintenance and support. The project is designed to in
  • Sensor solutions cuts maintenance and emissions
    December 8, 2014
    The new raft of sensor technology can provide cost savings as well as additional functionality, as David Crawford discovers. Austria’s third-largest city, Linz, with a population of around 200,000, is recording substantial savings in its urban tram network within 18 months of introducing a new, high-technology approach to its public transport management. Tram, bus and trolleybus operator Linz Linien forms part of city utilities management company Linz AG, which has been carrying out a wide-ranging Smart Cit
  • South Africa launches electric vehicle pilot programme
    February 28, 2013
    South Africa’s Department of Environmental Affairs (DEA) has launched a zero emission electric vehicle pilot programme, which would see it trial a fleet of electric vehicles. Speaking at the launch, water and environmental affairs minister Edna Molewa said the multi-stakeholder partnership project would pilot, test and demonstrate the viability of electric vehicles under South African conditions. The pilot programme would also serve to determine end-user, infrastructure and running costs associated with loc