Skip to main content

Brisbane to build combined road/rail tunnel

Australia’s Queensland Government has revealed concept designs for what would be the world’s first double-deck bus and rail tunnel to replace the planned Cross River Rail project. The 15 metres wide, the US$4.6 billion underground bus and train (UBAT) tunnel would be capable of accommodating a double-track railway and two bus lanes with three underground combined bus-and-rail stations. In a statement outlining the UBAT programme, Premier Campbell Newman said: “The project we are announcing today deliver
November 22, 2013 Read time: 2 mins
Australia’s Queensland Government has revealed concept designs for what would be the world’s first double-deck bus and rail tunnel to replace the planned Cross River Rail project.

The 15 metres wide, the US$4.6 billion underground bus and train (UBAT) tunnel would be capable of accommodating a double-track railway and two bus lanes with three underground combined bus-and-rail stations.

In a statement outlining the UBAT programme, Premier Campbell Newman said: “The project we are announcing today delivers the public transport services needed for the next 50 years.”

Deputy Premier and State Development, Infrastructure and Planning Minister Jeff Seeney said: “This exciting, world-class public transport project demonstrated that the Newman Government is fulfilling its election promise to deliver better infrastructure.

“Queenslanders will have access to one of the most innovative public transport connections in the world through the underground bus and train project. The government is also progressing other transport priorities, including the Bruce Highway and the Toowoomba Second Range Crossing.”

Queensland Government has said that work could begin as early as 2015, with construction planned for completion 2020.

Related Content

  • Lighting upgrade for Mersey tunnel
    November 6, 2014
    Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels. The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fitting
  • New Zealand government driving the switch to electric vehicles
    May 9, 2016
    The New Zealand government has announced plans to double the number of electric vehicles in the country every year to reach approximately 64,000 by 2021 in an ambitious and wide ranging package of measures to increase the uptake of electric vehicles. The package also includes extending the road user charges exemption on light electric vehicles until they make up two percent of the light vehicle fleet and a new road user charges exemption for heavy electric vehicles until they make up two percent of the h
  • New constellation will add accuracy and security to GNSS services
    December 20, 2013
    With Galileo’s early services scheduled to start next year, Fiammetta Diani is enthusiastic about the opportunities the EU’s GNSS system will offer. Next year will be a very exciting one for Galileo, the EU’s fledgling satellite constellation; additional satellites are scheduled for launch and, as European Commission Vice President Tajani recently announced, early operational services will be starting towards the end of 2014. So it really is ‘all systems go’ as Fiammetta Diani, market development officer in
  • Hartford’s tailors winter maintenance on Esri’s GIS platform
    August 5, 2016
    The in-house winter maintenance and vehicle tracking system built by the Public Works Department in Hartford, Connecticut, coped with record snowfalls and cut costs too. When it comes to dealing with the effects of mother nature, transport agencies can find themselves in a lose-lose situation: criticised if the roads or rail lines are disrupted by snow, ice or floods for more than a few hours and lambasted for wasting money if the equipment and stockpiles put in place for a hard winter remain unused.