Skip to main content

Breakthrough battery could revolutionise cost, range and safety of electric vehicles

Envia Systems, based in California, has announced test results that verify the company’s next-generation rechargeable battery has achieved the highest recorded energy density of 400 Watt-hours/kilogram (Wh/kg) for a rechargeable lithium-ion cell. When commercialised, this 400 Wh/kg battery is expected to slash the price of a 500km range electric vehicle by cutting the cost of the battery pack by more than 50 per cent. The testing of Envia’s next-generation lithium-ion battery was performed by the Electroche
March 23, 2012 Read time: 2 mins
4252 Envia Systems, based in California, has announced test results that verify the company’s next-generation rechargeable battery has achieved the highest recorded energy density of 400 Watt-hours/kilogram (Wh/kg) for a rechargeable lithium-ion cell. When commercialised, this 400 Wh/kg battery is expected to slash the price of a 500km range electric vehicle by cutting the cost of the battery pack by more than 50 per cent.

The testing of Envia’s next-generation lithium-ion battery was performed by the Electrochemical Power Systems Department at the 4253 Naval Surface Warfare Center (NSWC) in Crane, Indiana, under the sponsorship of ARPA-E. Tests at various cycling rates at NSWC confirmed that Envia’s automotive battery cell demonstrated energy density between 378-418 Wh/kg for rates between C/3 to C/10 for a 45 Amp-hour (C/3) cell. Similar cells have been cycling in Envia’s test labs for over 300 cycles. NSWC Crane will also test these cells to validate cycling performance.

“Since the inception of Envia, our product team has worked tirelessly and logged over 25 million test channel hours to optimally develop each of the active components of the battery: Envia's proprietary Si-C anode, HCMR cathode and EHV electrolyte," said Dr. Sujeet Kumar, Envia Systems co-founder, president & CTO.  “Rather than just a proof-of-concept of energy density, I am pleased that our team was successful in actually delivering 400 Wh/kg automotive grade 45 Ah lithium-ion rechargeable cells.”

“Envia’s new battery technology represents exactly the kind of innovation and breakthroughs that ARPA-E is looking for from the American research and development community,” said ARPA-E director Arun Majumdar.  “We hope that this low-cost and high-density battery technology enables widespread adoption of electric vehicles across the country and around the world.”

Envia was awarded grants by both the 4258 Advanced Research Projects Agency-Energy (ARPA-E) and the 4259 California Energy Commission in 2010 to develop high energy density batteries for electric vehicles. 4248 General Motors Ventures participated in an equity investment round of US$17 million in 2011.

Related Content

  • Truck platooning trials take to the highways
    July 24, 2017
    There is rising enthusiasm in America and beyond for the concept of truck platooning with trials being planned in several US states, as David Crawford reports. Growing numbers of US states are considering or implementing plans for trials of electronically-linked truck platooning on public road networks. This is in response to the interest being shown by the US$70bn a year road freight industry, where fuel represents 41% of the operating costs making the prospect of improving fuel economy by trucks travellin
  • Truck platooning trials take to the highways
    July 24, 2017
    There is rising enthusiasm in America and beyond for the concept of truck platooning with trials being planned in several US states, as David Crawford reports. Growing numbers of US states are considering or implementing plans for trials of electronically-linked truck platooning on public road networks. This is in response to the interest being shown by the US$70bn a year road freight industry, where fuel represents 41% of the operating costs making the prospect of improving fuel economy by trucks travellin
  • Another section of West Coast Green Highway EV charging infrastructure announced
    April 19, 2012
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • C/AVs could mean cheaper roads
    October 28, 2019
    The safety benefits of C/AVs have long been promoted – but research suggests they should also contribute to cheaper roads. David Crawford investigates the potential benefits in infrastructure costs Building narrower freeway lanes to accommodate the enhanced route-tracking capabilities of connected and autonomous vehicles (C/AVs), running in platoon conditions, could result in cost savings of £0.5 million (€0.56 million or US$6.5 million) for every km of road length built. Such benefits could be secur