Skip to main content

Brazil’s PAC 2 US$18 billion highway investment

Brazil has invested US$18.3bn in federal highway projects during phase two of its growth acceleration plan, PAC, according to the federal government's ninth balance report on PAC 2 works. The report, reviewing phase two's first three years (2011-13) of the four-year program, affirmed that work was carried out on 3,080 kilometres of highway stretches and highlighted various projects which were completed last year. Among them was BR-376 near southern Paraná state's Maringá city, BR-448 known as Rodovia
February 24, 2014 Read time: 2 mins
Brazil has invested US$18.3bn in federal highway projects during phase two of its growth acceleration plan, PAC, according to the federal government's ninth balance report on PAC 2 works.

The report, reviewing phase two's first three years (2011-13) of the four-year program, affirmed that work was carried out on 3,080 kilometres of highway stretches and highlighted various projects which were completed last year.

Among them was BR-376 near southern Paraná state's Maringá city, BR-448 known as Rodovia do Parque in the southern state of Rio Grande do Sul, and BR-324 known as Via Expressa near north-eastern Bahia state's Salvador port.

Projects on another 6,915 kilometres of roads are currently under way. A total of 4,367 kilometres is for restoration and paving and 2,548 kilometres for road widening and expansion, the report said.

Overall PAC 2 works, which include transportation infrastructure, basic sanitation and urban mobility, electric energy, housing, and other projects, saw a total of US$330 billion in investments from 2011-13. The four-year phase ends this December.

Related Content

  • Louis Berger to design interstate road modernisation in India
    September 4, 2017
    The National Highways Authority of India (NHAI) has selected Louis Berger to provide consultancy services for the preparation of detailed designs to upgrade around 7820 km of roads for two major road packages in southern India under the Bharatmala-Pariyojna scheme. The projects will include road widening and alignment; repaving; upgrades to intersections, bridges, bypasses and service roads; new toll plaza design; and improvements for more efficient traffic flow.
  • Connected Vehicles test vehicle to vehicle applications
    January 19, 2012
    In the US, the ITS Joint Program Office is about to conduct a series of Driver Clinics intended to gauge public reaction to Connected Vehicle safety technologies and applications. Starting in August, the US Department of Transportation (USDOT) will test Vehicle-to-Vehicle (V2V) applications with everyday drivers in what it describes as 'normal operational scenarios'. These Driver Clinics are being carried out at six locations across the US and together with the subsequent model deployment beginning in 2012,
  • Local Authority directors welcome Government’s transport review
    July 29, 2014
    The review of transport resilience recently published by the UK Government today (has been welcomed by the Association of Directors of Environment, Economy, Planning & Transport (ADEPT). The report looks at the resilience to extreme weather events of roads, railways, ports and airports across England and makes over 60 recommendations for action. David Bishop, President of ADEPT, said: “This review highlights the very real danger to our economic recovery from inadequate resilience in key aspects of the na
  • IBTTA backs Biden's 'infrastructure decade'
    March 2, 2022
    Group also calls on Biden-Harris administration to 'leverage capabilities' of tolling