Skip to main content

Brazilian PPP metro contract signed

Brazilian highway and metro concessionaire CCR has signed a US$1.85 billion contract for a public-private partnership (PPP) to carry out phase II work on Bahia state capital Salvador's metro system in northeast Brazil. The PPP involves building a total of 33.4 kilometres of metro lines and 19 stations and includes building an extension to the metro's existing 6.6 kilometre line 1 and preparing a project to extend the line some a further 3.6 kilometres.
October 22, 2013 Read time: 1 min
Brazilian highway and metro concessionaire CCR has signed a US$1.85 billion contract for a public-private partnership (PPP) to carry out phase II work on Bahia state capital Salvador's metro system in northeast Brazil.

The PPP involves building a total of 33.4 kilometres of metro lines and 19 stations and includes building an extension to the metro's existing 6.6 kilometre line 1 and preparing a project to extend the line some a further 3.6 kilometres.

A second metro line running will also be built which will connect with federal highway BR-324 and Salvador port. Once construction is complete, the concessionaire will operate both lines, which will have a total of 22 stations.

Construction is expected to take 42 months and the operational agreement is expected to be for about 27 years.

Related Content

  • Siemens extends first driverless metro line in Paris
    October 14, 2014
    Siemens has received an order worth around US$57 million from Paris transit authority RATP (Régie Autonome des Transports Parisiens) to supply the train control equipment and operational control system for the extension of the driverless metro line 14 in Paris. Siemens will supply its Trainguard communication based train control (CBTC) type automatic train protection system, which enables driverless operation. Siemens equipped the original stretch of line 14 for automatic operation in 1998, establish
  • China invests in transportation infrastructure
    February 19, 2014
    Construction of the 26.4- kilometre Jinan-Changqing line of the Jinan-Liaocheng railway in China will begin during March 2014. The project includes nine stations and will cost US$2.18 billion in total, out of which US$202 million is scheduled to be invested in 2014. Meanwhile, two cross-river bridge construction projects will be kicked off in Jinan in May 2014. They include a dual-use bridge across the Yellow River that will cost US$262 million and the 13.5- kilometre Changqing Yellow River bridge, which
  • Economic crisis needs non-partisan perspectives to stimulate growth
    February 2, 2012
    Kary Witt, President of the IBTTA and Pat Jones, Executive Director and CEO, talk about the need to put aside partisan perspectives in order to deal with the current economic crisis
  • Astaldi wins rail upgrade contract in Poland
    June 28, 2017
    The Italian Astaldi Group has been awarded the contract by Polskie Linie Kolejowe (PKP) to upgrade a section of the E-59 Warsaw-Poznań railway line (Lot IV).