Skip to main content

Brazilian bypass tender green-lighted

Brazil's Pernambuco state environmental authorities have approved a preliminary licence for construction of the US$459 million Arco Metropolitano bypass road's São Lourenço da Mata-Cabo de Santo Agostinho stretch. National transport infrastructure department DNIT is preparing final details to tender the project in state capital Recife's metropolitan region. It includes developing a basic plan and executing civil works, said national transport federation CNT in a release The project to build a 45km two
May 1, 2015 Read time: 2 mins
Brazil's Pernambuco state environmental authorities have approved a preliminary licence for construction of the US$459 million Arco Metropolitano bypass road's São Lourenço da Mata-Cabo de Santo Agostinho stretch.

National transport infrastructure department DNIT is preparing final details to tender the project in state capital Recife's metropolitan region. It includes developing a basic plan and executing civil works, said national transport federation CNT in a release

The project to build a 45km two-lane highway, linking the north and south stretches of federal highway BR-101, will start at the BR-408 junction in the city of São Lourenço da Mata and end at BR-101 near the city of Cabo de Santo Agostinho.

The highway will mitigate traffic congestion in urban Recife and facilitate cargo transport to Suape port in Ipojuca city. The Ipojuca-São Lourenço da Mata stretch will be built following completion of the São Lourenço da Mata-Cabo de Santo Agostinho stretch.

Falling under the country's growth acceleration plan, known as PAC, President Dilma Rousseff has confirmed that the project is included in a concessions program the federal government intends to announce in May, local paper Valor Econômico reported.

Related Content

  • Truck platooning trials take to the highways
    July 24, 2017
    There is rising enthusiasm in America and beyond for the concept of truck platooning with trials being planned in several US states, as David Crawford reports. Growing numbers of US states are considering or implementing plans for trials of electronically-linked truck platooning on public road networks. This is in response to the interest being shown by the US$70bn a year road freight industry, where fuel represents 41% of the operating costs making the prospect of improving fuel economy by trucks travellin
  • Truck platooning trials take to the highways
    July 24, 2017
    There is rising enthusiasm in America and beyond for the concept of truck platooning with trials being planned in several US states, as David Crawford reports. Growing numbers of US states are considering or implementing plans for trials of electronically-linked truck platooning on public road networks. This is in response to the interest being shown by the US$70bn a year road freight industry, where fuel represents 41% of the operating costs making the prospect of improving fuel economy by trucks travellin
  • OPINION: ITS must be included in EU Green Deal
    September 14, 2022
    To reach the objectives of the European Green Deal, a classification system has been developed to identify environmentally-sustainable activities. However, Richard Lax of Kapsch TrafficCom is worried that it might not have the intended effect – and ITS could lose out as a result…
  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was