Skip to main content

Brazil state advances LRT project

Plans for a US$427 million light rail transit (LRT) system in Brazil's Minas Gerais state are moving forward. The project, for Uberlândia city, is being spearheaded by Uberlândia federal university (UFU) and the local authorities. A draft proposal was presented to the public this week for feedback and the university is now working on a basic engineering plan. City hall and the federal government would seek funding for the construction of the project. The LRT will have two lines, one spanning 6.9 kilom
December 8, 2014 Read time: 1 min
Plans for a US$427 million light rail transit (LRT) system in Brazil's Minas Gerais state are moving forward.

The project, for Uberlândia city, is being spearheaded by Uberlândia federal university (UFU) and the local authorities. A draft proposal was presented to the public this week for feedback and the university is now working on a basic engineering plan. City hall and the federal government would seek funding for the construction of the project.

The LRT will have two lines, one spanning 6.9 kilometres with 23 stations and with the capacity to handle around 65,000 passengers a day. The second line will span 17.5 kilometres and have 19 stations, with the capacity to transport around 15,400 passengers a day.

Related Content

  • Tolling is the 21st century’s road funding solution
    June 5, 2015
    HNTB’s Rick Herrington and Brad Guilmino put the case for tolling. Tolling is becoming the 21st century solution of choice for generating additional user-based transportation revenue. The proven funding source is being seriously considered for expanded use by cities, states and even the federal government with support from elected officials across the political spectrum. In fact, with each federal transportation reauthorisation, tolling restrictions have been relaxed.
  • Syracuse models post-industrial revival for US cities
    August 13, 2015
    A connective corridor in Syracuse, New York State, could be a model for other post-industrial cities, as David Crawford discovers. The aim of the city of Syracuse’ 5.6km-long Connective Corridor in Onandaga County in upstate New York is to create a model ‘complete street’ for use in wider regeneration schemes. Key transport-sector components are traffic calming, high-quality transit with accessible passenger information, plus walkability and bike-friendliness.
  • Thailand to spend over US$19 billion for six more MRT rail lines
    August 24, 2012
    The Mass Rapid Transit Authority (MRTA) of Thailand is to make immediate plans to develop six additional mass rapid transit (MRT) rail lines that should be operational by 2020. The lines will measure a length of 200 kilometres and entail US$19.16 billion in combined investments. The move was spurred by a forecast that suggests some three million passengers a day will use the MRT rail system in Bangkok by 2020.
  • Brazil opts for freeflow tolling
    April 9, 2014
    David Crawford explores the technical background of Brazil’s First multi-lane free-flow tolling system. The 2013 opening of Brazil’s first fully-operational, all-vehicle, multi-lane free-flow (MLFF) tolling system in the state of São Paolo has set the scene for a new phase of modern electronic fee collection (EFC) deployment in Latin America’s largest country. It has toll programmes at both federal and state levels, with São Paulo – the most populous state, with the largest road network – leading in the awa