Skip to main content

Brazil-Spain group could lose highway contract

An engineering consortium made up of Brazil's Mendes Junior and Spain's Isolux Corsán could be stripped of its US$208 million contract to build part of the northern stretch of the Mario Covas beltway surrounding the city of São Paulo. The consortium, led by Mendes Junior, is having difficulty honouring commitments due to a lack of cash flow and, according to São Paulo state highway company Dersa, it is not completing works according to the contract schedule signed in January 2013, local paper Folha de Sã
April 10, 2015 Read time: 2 mins
RSSA consortium of Brazil's 6871 Mendes Junior and Spain's 1954 Isolux Corsán could lose its US$208 million contract to build part of the northern section of the Mario Covas beltway around the Brazilian city of São Paulo.

The consortium, led by Mendes Junior, is falling behind schedule because of cash flow problems, according to São Paulo state highway company 5947 Dersa. The deal was signed in January 2013, local paper Folha de São Paulo reported.

If matters do not improve this month, "it is very likely that we will terminate our agreement based on a breach of contract," Dersa president Laurence Casagrande was quoted as saying.

The 180km Rodoanel Mário Covas beltway is partially with a radius of around 23km from the geographical centre of Sao Paulo. It was named after Mário Covas, mayor of the city between 1983–1985 and a state governor from 1994-2001 until his death from cancer. It is a controlled access highway with a speed limit of 100kph.

The northern segment is the last of the bletway’s four sections to be built. Construction of Dersa’s stretch of the northern section was originally scheduled to be completed last year but was rescheduled to January 2016. However, at the beginning of this year, Dersa pushed back the completion date to the first half of 2017.

If terminated, Dersa could transfer the work to local construction company 4740 Odebrecht, which submitted the next best offer for the contract. If not, a new tender for the remaining work could be launched, according to the news report.

Mendes Junior is one of many engineering companies under investigated by the federal government's so called car wash corruption probe.

For more information on companies in this article

Related Content

  • Init wins biggest order in group history
    July 24, 2012
    In one of the largest telematics projects for public transport ever deployed in Germany, Init, a provider of ITS and electronic fare management for public transport, will be the general contractor in a project for a joint tendering group led by Rheinbahn Düsseldorf. For this project, Init will set up a Tetra trunked system and install a new intermodal transport control system (ITCS) for the group over the next four years.
  • Emerging technologies that could have major impacts on transportation
    January 29, 2016
    A recent report by US Volpe experts identifies eleven emerging technologies and innovative applications that may have significant impacts on our transportation systems within three to five years. The report, 2015 OST-R Transportation Technology Scan: A Look Ahead, identifies technological advances and innovative concepts, along with their associated benefits, challenges and risks that could fundamentally alter the transportation landscape:
  • ITS technology reduces congestion, improves workzone safety
    July 17, 2012
    As the road-building season gets under way in the US, the Federal Highway Administration has just published a White Paper which deals with the use of ITS technology in work zones. On 30 April 2009, the US Federal Highway Administration (FHWA) published a White Paper which was prepared by the US Department of Transportation (USDOT) to inform public agencies about the use of ITS to manage construction work zones. This is a particularly relevant topic given the large number of construction projects that are ex
  • Systra wins Bagdad underground metro contract
    April 25, 2012
    During a visit to Paris, a delegation from the Bagdad Mayoralty in Paris has signed a contract with Systra for the design and tender services for the Bagdad Underground Metro Lines 1 and 2, which are intended to be the backbone of future transport development in the Iraqi capital. Systra’s contract involves the basic design, preparation of tender documents, and selection of EPC Contractor for two underground metro lines.