Skip to main content

Brazil-Spain group could lose highway contract

An engineering consortium made up of Brazil's Mendes Junior and Spain's Isolux Corsán could be stripped of its US$208 million contract to build part of the northern stretch of the Mario Covas beltway surrounding the city of São Paulo. The consortium, led by Mendes Junior, is having difficulty honouring commitments due to a lack of cash flow and, according to São Paulo state highway company Dersa, it is not completing works according to the contract schedule signed in January 2013, local paper Folha de Sã
April 10, 2015 Read time: 2 mins
RSSA consortium of Brazil's 6871 Mendes Junior and Spain's 1954 Isolux Corsán could lose its US$208 million contract to build part of the northern section of the Mario Covas beltway around the Brazilian city of São Paulo.

The consortium, led by Mendes Junior, is falling behind schedule because of cash flow problems, according to São Paulo state highway company 5947 Dersa. The deal was signed in January 2013, local paper Folha de São Paulo reported.

If matters do not improve this month, "it is very likely that we will terminate our agreement based on a breach of contract," Dersa president Laurence Casagrande was quoted as saying.

The 180km Rodoanel Mário Covas beltway is partially with a radius of around 23km from the geographical centre of Sao Paulo. It was named after Mário Covas, mayor of the city between 1983–1985 and a state governor from 1994-2001 until his death from cancer. It is a controlled access highway with a speed limit of 100kph.

The northern segment is the last of the bletway’s four sections to be built. Construction of Dersa’s stretch of the northern section was originally scheduled to be completed last year but was rescheduled to January 2016. However, at the beginning of this year, Dersa pushed back the completion date to the first half of 2017.

If terminated, Dersa could transfer the work to local construction company 4740 Odebrecht, which submitted the next best offer for the contract. If not, a new tender for the remaining work could be launched, according to the news report.

Mendes Junior is one of many engineering companies under investigated by the federal government's so called car wash corruption probe.

For more information on companies in this article

Related Content

  • ‘Free’ power for signs, shelters and so much more
    March 17, 2016
    David Crawford looks at the sunny side of the street. Solar power has been relatively slow in entering the transport sector, but a current blossoming of activity bodes well for the large-scale harnessing of an alternative energy that is zero-emission at source and, in practical terms, infinitely renewable. Traffic management and traveller information systems, and actual vehicles, are all emerging as areas for deployment. Meanwhile roads themselves are being viewed as new-style, fossil fuel-free ‘power stati
  • Kapsch wins Latvia traffic contract
    February 9, 2023
    Drivers on E-67 highway around Latvian capital Riga will benefit from real-time info
  • Renault-Nissan wins 15,000 international vehicle contract with Danone
    July 6, 2012
    The Renault-Nissan Alliance will provide 15,000 vehicles in an exclusive fleet contract with the Paris-based nutritional food company Danone. The first-of-its-kind deal for the Alliance provides a full range of vehicles to Danone in 25 countries for at least five years.
  • Siemens to electrify metro line in Ecuador
    October 21, 2016
    Siemens has been commissioned by the Acciona-Odebrecht construction consortium to electrify the entire Metro Line 1 in the Ecuador capital, Quito. Line 1 is intended to improve daily commuting in the city, since it will provide direct routes from north and south of the city into the downtown area and historical city centre. The line is scheduled to begin passenger service in summer 2019. The city's first metro line will run over 20 kilometres through the city and operate at an elevation of more than 2,80