Skip to main content

Brazil-Spain group could lose highway contract

An engineering consortium made up of Brazil's Mendes Junior and Spain's Isolux Corsán could be stripped of its US$208 million contract to build part of the northern stretch of the Mario Covas beltway surrounding the city of São Paulo. The consortium, led by Mendes Junior, is having difficulty honouring commitments due to a lack of cash flow and, according to São Paulo state highway company Dersa, it is not completing works according to the contract schedule signed in January 2013, local paper Folha de Sã
April 10, 2015 Read time: 2 mins
RSSA consortium of Brazil's 6871 Mendes Junior and Spain's 1954 Isolux Corsán could lose its US$208 million contract to build part of the northern section of the Mario Covas beltway around the Brazilian city of São Paulo.

The consortium, led by Mendes Junior, is falling behind schedule because of cash flow problems, according to São Paulo state highway company 5947 Dersa. The deal was signed in January 2013, local paper Folha de São Paulo reported.

If matters do not improve this month, "it is very likely that we will terminate our agreement based on a breach of contract," Dersa president Laurence Casagrande was quoted as saying.

The 180km Rodoanel Mário Covas beltway is partially with a radius of around 23km from the geographical centre of Sao Paulo. It was named after Mário Covas, mayor of the city between 1983–1985 and a state governor from 1994-2001 until his death from cancer. It is a controlled access highway with a speed limit of 100kph.

The northern segment is the last of the bletway’s four sections to be built. Construction of Dersa’s stretch of the northern section was originally scheduled to be completed last year but was rescheduled to January 2016. However, at the beginning of this year, Dersa pushed back the completion date to the first half of 2017.

If terminated, Dersa could transfer the work to local construction company 4740 Odebrecht, which submitted the next best offer for the contract. If not, a new tender for the remaining work could be launched, according to the news report.

Mendes Junior is one of many engineering companies under investigated by the federal government's so called car wash corruption probe.

For more information on companies in this article

Related Content

  • TagMaster wins order from Bombardier for São Paulo Line 5 Project
    July 25, 2012
    Sweden-headquartered TagMaster has received an order from Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.
  • Monitoring and transparency preserve enforcement's reputation
    July 30, 2012
    What can be done to preserve automated enforcement's reputation in the face of media and public criticism? Here, system manufacturers and suppliers talk about what they think are the most appropriate business models. Recent events in Italy only served to once again to push automated enforcement into the media spotlight. At the heart of the matter were the numerous alleged instances of local authorities and their contract suppliers of enforcement services colluding to illegally shorten amber signal phase tim
  • Test Article Page 1
    September 9, 2014
    Test Article Page 1
  • Kapsch TrafficCom wins big in Sydney
    December 9, 2014
    The WestConnex Delivery Authority (WDA) in Sydney, Australia, has awarded Kapsch CarrierCom subsidiary, Kapsch CarrierCom Australia, the contract to supply a roadside tolling system to support capacity enhancement to the M4 motorway widening project as part of Stage 1 of the WestConnex motorway scheme in Sydney. The award covers two contracts for the initial phase of the project, one for the roadside equipment for the M4 widening segment and one for maintenance and support. The project is designed to in