Skip to main content

Brazil-Spain group could lose highway contract

An engineering consortium made up of Brazil's Mendes Junior and Spain's Isolux Corsán could be stripped of its US$208 million contract to build part of the northern stretch of the Mario Covas beltway surrounding the city of São Paulo. The consortium, led by Mendes Junior, is having difficulty honouring commitments due to a lack of cash flow and, according to São Paulo state highway company Dersa, it is not completing works according to the contract schedule signed in January 2013, local paper Folha de Sã
April 10, 2015 Read time: 2 mins
RSSA consortium of Brazil's 6871 Mendes Junior and Spain's 1954 Isolux Corsán could lose its US$208 million contract to build part of the northern section of the Mario Covas beltway around the Brazilian city of São Paulo.

The consortium, led by Mendes Junior, is falling behind schedule because of cash flow problems, according to São Paulo state highway company 5947 Dersa. The deal was signed in January 2013, local paper Folha de São Paulo reported.

If matters do not improve this month, "it is very likely that we will terminate our agreement based on a breach of contract," Dersa president Laurence Casagrande was quoted as saying.

The 180km Rodoanel Mário Covas beltway is partially with a radius of around 23km from the geographical centre of Sao Paulo. It was named after Mário Covas, mayor of the city between 1983–1985 and a state governor from 1994-2001 until his death from cancer. It is a controlled access highway with a speed limit of 100kph.

The northern segment is the last of the bletway’s four sections to be built. Construction of Dersa’s stretch of the northern section was originally scheduled to be completed last year but was rescheduled to January 2016. However, at the beginning of this year, Dersa pushed back the completion date to the first half of 2017.

If terminated, Dersa could transfer the work to local construction company 4740 Odebrecht, which submitted the next best offer for the contract. If not, a new tender for the remaining work could be launched, according to the news report.

Mendes Junior is one of many engineering companies under investigated by the federal government's so called car wash corruption probe.

For more information on companies in this article

Related Content

  • IBTTA names new president
    January 13, 2015
    A Miami transportation executive, Javier Rodriguez, executive director of the Miami-Dade Expressway Authority (MDX), has been named 2015 president of the International Bridge, Tunnel and Turnpike Association’s (IBTTA). As a transportation leader, Rodriguez is poised to lead IBTTA during this challenging time. Under Rodriguez's leadership, MDX converted its expressways to an all-electronic system. Before joining MDX in 2007, Rodriguez spent 16 years with the Florida Department of Transportation, including
  • World Congress rewards outstanding ITS
    September 9, 2014
    Tradition dictates that the ITS World Congress is the setting for a variety of award presentations, and 2014 is no exception. During the glittering 2014 ITS World Congress opening ceremony the first of a series of awards was presented with São Paulo’s Municipal Department of Transport receiving the MobiPrize Enterprising City/State Award.
  • Strabag wins Polish bypass contract
    September 11, 2014
    A consortium of Strabag and its subsidiary Heilit and Woerner has been awarded a US$51.7 million design-and-build contract for a 7.6 kilometre bypass around the city of Kościerzyna in northern Poland. The project comprises the construction of three traffic lanes with one additional lane that can be adapted for traffic if needed. It also includes nine civil engineering structures, including bridges and a railway overpass; environmental protection measures such as noise barriers and wildlife crossings; a
  • Dubai metro - the world's longest automated rail system
    July 31, 2012
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.