Skip to main content

Brazil draws up transport concession timetable

Brazil's federal government has drawn up a tender launch schedule for highway, railway, airport, waterway, and port dredging concessions. Feasibility studies for the country's upcoming concessions have already been completed and tenders are due to be launched in the fourth quarter, local paper Valor Econômico reported. To date, a total of 493 kilometres of sections of federal highway, from Paraná state's Lapa city to Santa Catarina state's Chapecó city, are waiting to be put out to tender. Additional highwa
March 19, 2015 Read time: 2 mins
Brazil's federal government has drawn up a tender launch schedule for highway, railway, airport, waterway, and port dredging concessions.

Feasibility studies for the country's upcoming concessions have already been completed and tenders are due to be launched in the fourth quarter, local paper Valor Econômico reported.

To date, a total of 493 kilometres of sections of federal highway, from Paraná state's Lapa city to Santa Catarina state's Chapecó city, are waiting to be put out to tender. Additional highway stretches will be announced from June, planning minister Nelson Barbosa has said.

Current concession holders are interested in expanding the country's railway network in exchange for extensions to their concession contracts. The federal government is planning to evaluate their proposals shortly. Although the government is considering launching a tender for the Centro-Oeste integration railway (Fico), it has received provisional interest only from foreign parties and is currently awaiting local investors to get involved.

President Dilma Rousseff has confirmed that airport concessions in the state capitals of Porto Alegre (Rio Grande do Sul state), Florianópolis (Santa Catarina) and Salvador (Bahia) would be put out to tender in parallel with the restructuring of national airport authority Infraero. After privatising the most lucrative airports, Infraero is experiencing financial problems.

Tenders are also expected for waterways, where priority will be given to the north of Brazil. The federal government is currently developing plans for the Tapajós, Madeira and Tocantins rivers, as well as the Mercosul waterway in the south.

Related Content

  • Supply chain issues: AGD looks ahead
    June 2, 2022
    There are multiple causes for current global supply chain issues – and this isn’t likely to improve in the near future. Ian Hind of ITS manufacturer AGD Systems spells out how to mitigate the impact
  • Performance indicators help differentiate between truck tolling systems
    August 20, 2014
    Traffic Quality Management Karl Ernst Ambrosch talks to ITS International about a new KPI-based methodology for assessing the efficacy of electronic toll collection schemes The debate over which is the ‘best’ solution for applications such as truck tolling is now years old.
  • Kapsch TrafficCom to upgrade tolling system technology in Chile
    September 4, 2015
    Kapsch TrafficCom has secured five new contracts in Chile through a subsidiary and will carry out a technology upgrade of the existing tolling system on 900 kilometres of the famous Pan-American Highway Ruta 5. Kapsch will also be responsible for the maintenance of the new system for five years. The combined value of the contracts amounts to more than US$9.9 million and includes the upgrade of 320 lanes and 90 toll plazas in Ruta del Maipo, Ruta del Maule, Ruta del Bosque, Ruta de la Araucanía and Ruta de l
  • The bottom line - US surface transportation system needs major investment
    December 12, 2014
    The 2015 Bottom Line Report on transportation investment needs, released by the American Association of State Highway and Transportation Officials and the American Public Transportation Association, estimates that to meet current demand it will require an annual capital investment over six years by all levels of government in the amount of $120 billion in the nation’s highway and bridge network and US$43 billion in America’s public transportation infrastructure. To meet the combined surface transportation