Skip to main content

Brazil completes US$25bn PAC transport works

The Brazilian government completed about US$24.5 billion worth of transportation infrastructure projects under the second phase (2011-14) of its growth acceleration plan (PAC). According to the latest PAC report, a total of 5,188kilometres of roadwork has been completed over the last four years, including 1,413 kilometres through concession contracts. Works included widening highway BR-060 in Goiás state; and building the Rio de Janeiro Arco beltway along highway BR-493, highway BR-448 (Rodovia do Par
December 19, 2014 Read time: 2 mins
The Brazilian government completed about US$24.5 billion worth of transportation infrastructure projects under the second phase (2011-14) of its growth acceleration plan (PAC).

According to the latest PAC report, a total of 5,188kilometres of roadwork has been completed over the last four years, including 1,413 kilometres through concession contracts.

Works included widening highway BR-060 in Goiás state; and building the Rio de Janeiro Arco beltway along highway BR-493, highway BR-448 (Rodovia do Parque) in Rio Grande do Sul state and highway BR-324 (Via Expressa) in the state of Bahia.

Another 7,002 kilometres of roadwork is currently under way, the report said.

During the period, 855 kilometres of the Norte-Sul railway running between Tocantins state capital Palmas and Goiás state's Anápolis city began operations, as did 247 kilometres of the Ferronorte railway in Mato Grosso state between the municipalities of Alto Araguaia and Rondonópolis.

A total of 30 ports projects were also completed, along with 37 airport projects to increase passenger handling facilities.

Related Content

  • GridMatrix goes back to the future in New York City
    September 25, 2023
    Legacy traffic management infrastructure doesn’t have to be a marker of the past: software upgrades can bring it into the present in a cost-effective and timely way, says Gordon Feller
  • Thales to supply communications systems for Hyderabad Metro Rail
    December 11, 2012
    Thales India has been appointed by engineering and construction company Larsen & Toubro to provide Communications Based Train Control (CBTC) and Integrated Communications and Supervision (ICS) systems for the Hyderabad Metro rail project, to be implemented on rail lines 1, 2 and 3, covering 72 km of rail and comprising of 66 stations. Thales will design, build, deliver and manage the installation of its SelTrac Communications-Based Train Control solution, which is already in use by more than thirty of the w
  • Q-Free preparing for new projects
    April 27, 2012
    Q-Free has announced revenues of US$21.11 million during the first quarter 2012 compared to US$29.66 million in the corresponding quarter in 2011, while order intake came in at $44.29 million, $6.45 million more than in previous quarter and $2.96 million more than in Q1-2011, reflecting, the company says, that its general optimism regarding demand is well grounded.
  • UK defaults to hard shoulder running to expand motorway capacity
    April 8, 2014
    Hard shoulder running has become the UK’s default response to increasing motorway capacity as Colin Sowman reports. Facing a predicted 46% increase in traffic levels by 2040 and the current economic recovery leading to more people travelling to, from and for work leaves the UK government under short- and long-term pressure to increase the capacity on the main motorway network. Particular sections of motorways are already experiencing repeated, sometimes tidal, congestion and both tight Treasury limits and t