Skip to main content

Bombardier's Innovia ATM to meet passenger demand at Shenzen Airport

Bombardier Transportation says its automated people mover (APM) 300 system will help manage increasing passenger numbers at China's Shenzhen Airport, terminal 3. The contract, valued ¥453m (£53m), will be carried out by CRRC Puzhen Bombardier Transportation Systems (PBTS) and is expected to be operational in 2020. PBTS is a joint venture between Bombardier Transportation and Chinese railway rolling stock manufacturer CRRC Nanjing Puzhen. Through the agreement, PBTS will deliver an integrated system
June 21, 2018 Read time: 1 min
513 Bombardier Transportation says its automated people mover (APM) 300 system will help manage increasing passenger numbers at China's Shenzhen Airport, terminal 3. The contract, valued ¥453m (£53m), will be carried out by CRRC Puzhen Bombardier Transportation Systems (PBTS) and is expected to be operational in 2020.


PBTS is a joint venture between Bombardier Transportation and Chinese railway rolling stock manufacturer CRRC Nanjing Puzhen.

Through the agreement, PBTS will deliver an integrated system package, including 18 cars, for a 2.6 km APM line and will connect an airside satellite to the terminal.

The company says Innovia features spacious interiors to accommodate high passenger volumes and customised seating to suit urban and airport applications. The vehicle also includes designated spaces for passengers with restricted mobility.

Related Content

  • November 27, 2020
    Global mobility study: world on the move
    ERF reviews impact of new mobility on road infrastructure in 20 countries pre-Covid
  • April 12, 2018
    Louis Berger awarded Mumbai Metro Line four contract
    The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
  • June 22, 2012
    Miami APM operational
    Miami International Airport’s Automated People Mover (APM) is now operational, with a capacity to move more than 3,000 passengers per hour, at a top speed of 65km/h. The driverless system was constructed by Mitsubishi Heavy Industries and is the company’s fourth APM deployment in the US.
  • August 3, 2020
    Elon Musk’s underground movement
    The Boring Company is building tunnels under various US cities – but for what? Kristina Smith delves deep into a project which may (eventually) have real appeal for mass transit providers and transportation agencies