Skip to main content

Bombardier wins contracts for the first monorails in Thailand

Bombardier Transportation has been awarded two contracts for its Bombardier Innovia Monorail 300 system for two mass rapid transit lines in Bangkok. The contracts are with Northern Bangkok Monorail (NBM) and the Eastern Bangkok Monorail (EBM), responsible for the turnkey construction and 30-year concession of the new, elevated lines. Bombardier will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72 four-car Innovia Monorail 300 trains equi
August 14, 2017 Read time: 2 mins
513 Bombardier Transportation has been awarded two contracts for its Bombardier Innovia Monorail 300 system for two mass rapid transit lines in Bangkok. The contracts are with Northern Bangkok Monorail (NBM) and the Eastern Bangkok Monorail (EBM), responsible for the turnkey construction and 30-year concession of the new, elevated lines.


Bombardier will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72 four-car Innovia Monorail 300 trains equipped with Bombardier Cityflo 650 automatic train control technology for driverless operation. The contract with NBM comprises the new 34.5 km Khae Rai-MinBuri (Pink) Line to operate with 42 train sets, while, for EBM, the contract includes 30 train sets for the 30.4 km Lat Phrao-Samrong (Yellow) Line. The contracts also include project management, systems engineering and integration, testing and commissioning for the new trains and systems.

Operating in the city’s northern and eastern areas, the monorails will integrate with the existing transportation network and run at speeds up to 80 km/h with a maximum capacity of over 28,000 passengers per hour, per direction.

For more information on companies in this article

Related Content

  • Thales installs signalling technology for Ottawa line extension
    June 26, 2019
    Thales is to provide its SelTrac Communications Based Train Control (CBTC) system for the City of Ottawa’s Stage 2 O-Train Confederation Line Extension project in Canada. Thales says the line will take 780,000 annual rush-hour bus trips off the road and will carry up to 24,000 customers per hour. Once complete, it will run from Trim Road and west to Baseline Road and Moodie Drive across 29 stations spanning a distance of 40km. The CBTC moves block signalling technologies to actively manage the track in r
  • ‘Free’ power for signs, shelters and so much more
    March 17, 2016
    David Crawford looks at the sunny side of the street. Solar power has been relatively slow in entering the transport sector, but a current blossoming of activity bodes well for the large-scale harnessing of an alternative energy that is zero-emission at source and, in practical terms, infinitely renewable. Traffic management and traveller information systems, and actual vehicles, are all emerging as areas for deployment. Meanwhile roads themselves are being viewed as new-style, fossil fuel-free ‘power stati
  • EU to fund common train control system
    April 15, 2015
    The EU's TEN-T Programme is to provide funding of over US$16 million for the development and installation of the common European Train Control System (ETCS) in Belgium, Luxembourg, Denmark and the UK. The new system is expected to improve the interoperability, safety, reliability and capacity on European railways. Seven separate projects aim to contribute to the deployment of the European Rail Traffic Management System (ERTMS) in the EU and enhance interoperability of European rail services. While increa
  • Upgrading Koblenz's traffic information system
    March 1, 2013
    David Crawford reviews an award-winning scheme that delivered a 30% increase in website usage – below budget The German Federal Agricul­tural Show (Bundesgarten­schau, BUGA) runs between mid-April and mid-October every other year in a differ­ent city. The most recent, 2011, edition took place in Koblenz, a medium-sized community with a population of just over 105,000 in the Rheinland-Pfalz region, and was expected to draw an additional 40,000 visitors a day to its central area. Traffic access from the moto