Skip to main content

Bombardier wins contracts for the first monorails in Thailand

Bombardier Transportation has been awarded two contracts for its Bombardier Innovia Monorail 300 system for two mass rapid transit lines in Bangkok. The contracts are with Northern Bangkok Monorail (NBM) and the Eastern Bangkok Monorail (EBM), responsible for the turnkey construction and 30-year concession of the new, elevated lines. Bombardier will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72 four-car Innovia Monorail 300 trains equi
August 14, 2017 Read time: 2 mins
513 Bombardier Transportation has been awarded two contracts for its Bombardier Innovia Monorail 300 system for two mass rapid transit lines in Bangkok. The contracts are with Northern Bangkok Monorail (NBM) and the Eastern Bangkok Monorail (EBM), responsible for the turnkey construction and 30-year concession of the new, elevated lines.


Bombardier will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72 four-car Innovia Monorail 300 trains equipped with Bombardier Cityflo 650 automatic train control technology for driverless operation. The contract with NBM comprises the new 34.5 km Khae Rai-MinBuri (Pink) Line to operate with 42 train sets, while, for EBM, the contract includes 30 train sets for the 30.4 km Lat Phrao-Samrong (Yellow) Line. The contracts also include project management, systems engineering and integration, testing and commissioning for the new trains and systems.

Operating in the city’s northern and eastern areas, the monorails will integrate with the existing transportation network and run at speeds up to 80 km/h with a maximum capacity of over 28,000 passengers per hour, per direction.

Related Content

  • January 26, 2012
    Vancouver's metro transport promotes alternatives to driving
    David Crawford looks at Vancouver and the legacy of a Olympic transport success
  • July 23, 2019
    ADB approves grant for BRT in Karachi
    The Asian Development Bank (ADB) has approved a $235 million loan to help develop a bus rapid transit (BRT) system in Karachi, Pakistan. The project will deliver the 26km Bus Rapid Transit Line Red Line Corridor and associated facilities. More than 300,000 passengers per day are expected on the Red Line BRT routes. It will include the construction of 29 stations and dedicated lanes, a roadway with up to six lanes in each direction, on-street parking and green areas well as the installation of bicycl
  • October 25, 2024
    Arriva wins Netherlands contract in Gelderland
    Bus deal starts in December 2025 and could run until 2042 if extension applied
  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab