Skip to main content

Bombardier wins contracts for the first monorails in Thailand

Bombardier Transportation has been awarded two contracts for its Bombardier Innovia Monorail 300 system for two mass rapid transit lines in Bangkok. The contracts are with Northern Bangkok Monorail (NBM) and the Eastern Bangkok Monorail (EBM), responsible for the turnkey construction and 30-year concession of the new, elevated lines. Bombardier will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72 four-car Innovia Monorail 300 trains equi
August 14, 2017 Read time: 2 mins
513 Bombardier Transportation has been awarded two contracts for its Bombardier Innovia Monorail 300 system for two mass rapid transit lines in Bangkok. The contracts are with Northern Bangkok Monorail (NBM) and the Eastern Bangkok Monorail (EBM), responsible for the turnkey construction and 30-year concession of the new, elevated lines.


Bombardier will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72 four-car Innovia Monorail 300 trains equipped with Bombardier Cityflo 650 automatic train control technology for driverless operation. The contract with NBM comprises the new 34.5 km Khae Rai-MinBuri (Pink) Line to operate with 42 train sets, while, for EBM, the contract includes 30 train sets for the 30.4 km Lat Phrao-Samrong (Yellow) Line. The contracts also include project management, systems engineering and integration, testing and commissioning for the new trains and systems.

Operating in the city’s northern and eastern areas, the monorails will integrate with the existing transportation network and run at speeds up to 80 km/h with a maximum capacity of over 28,000 passengers per hour, per direction.

Related Content

  • December 11, 2012
    Thales to supply communications systems for Hyderabad Metro Rail
    Thales India has been appointed by engineering and construction company Larsen & Toubro to provide Communications Based Train Control (CBTC) and Integrated Communications and Supervision (ICS) systems for the Hyderabad Metro rail project, to be implemented on rail lines 1, 2 and 3, covering 72 km of rail and comprising of 66 stations. Thales will design, build, deliver and manage the installation of its SelTrac Communications-Based Train Control solution, which is already in use by more than thirty of the w
  • August 24, 2012
    Thailand to spend over US$19 billion for six more MRT rail lines
    The Mass Rapid Transit Authority (MRTA) of Thailand is to make immediate plans to develop six additional mass rapid transit (MRT) rail lines that should be operational by 2020. The lines will measure a length of 200 kilometres and entail US$19.16 billion in combined investments. The move was spurred by a forecast that suggests some three million passengers a day will use the MRT rail system in Bangkok by 2020.
  • July 31, 2012
    Russia's high speed toll link - aims and opportunities
    Construction of a new toll link between the Russian capital of Moscow and the country's second-largest city, the port of St Petersburg, is due to start in 2012. Here, ITS International takes look at the project to date and the opportunities for foreign companies to get involved. The construction of a new toll link between the Russian capital Moscow and the country's second-largest city St Petersburg has a number of aims. It will lead to the creation of a high-speed vehicular link between the two which will
  • October 21, 2021
    Urban.Mass to roll out autonomous pods 
    Pods can “flock” together into connected trains or run individually