Skip to main content

Bombardier wins contracts for the first monorails in Thailand

Bombardier Transportation has been awarded two contracts for its Bombardier Innovia Monorail 300 system for two mass rapid transit lines in Bangkok. The contracts are with Northern Bangkok Monorail (NBM) and the Eastern Bangkok Monorail (EBM), responsible for the turnkey construction and 30-year concession of the new, elevated lines. Bombardier will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72 four-car Innovia Monorail 300 trains equi
August 14, 2017 Read time: 2 mins
513 Bombardier Transportation has been awarded two contracts for its Bombardier Innovia Monorail 300 system for two mass rapid transit lines in Bangkok. The contracts are with Northern Bangkok Monorail (NBM) and the Eastern Bangkok Monorail (EBM), responsible for the turnkey construction and 30-year concession of the new, elevated lines.


Bombardier will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72 four-car Innovia Monorail 300 trains equipped with Bombardier Cityflo 650 automatic train control technology for driverless operation. The contract with NBM comprises the new 34.5 km Khae Rai-MinBuri (Pink) Line to operate with 42 train sets, while, for EBM, the contract includes 30 train sets for the 30.4 km Lat Phrao-Samrong (Yellow) Line. The contracts also include project management, systems engineering and integration, testing and commissioning for the new trains and systems.

Operating in the city’s northern and eastern areas, the monorails will integrate with the existing transportation network and run at speeds up to 80 km/h with a maximum capacity of over 28,000 passengers per hour, per direction.

For more information on companies in this article

Related Content

  • Indra to implement ticketing technology for new Algerian trolley line
    September 7, 2015
    Alstom Transport has awarded Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif. With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi. Indra will supply ticketing systems for the 27 stations and four interchanges p
  • Sustainable mobility: innovative solutions needed to reduce traffic emissions
    May 1, 2021
    Kapsch TrafficCom’s Mobility Report 2021 reveals how new ITS measures such as vehicle connectivity and AI-based data processing can help create joined-up traffic management
  • First phase of Houston reversible HOV to HOT lanes completed
    June 19, 2012
    Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilization of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135kms
  • Real time active traffic management improves travel times
    July 17, 2012
    Traffic management centres (TMC) have traditionally served to provide surveillance and responses to traffic incidents and recurring and non-recurring changes in road networks. Typically, a TMC collected field data from the roadway and transit infrastructure and provided the integration necessary for operators to see what was happening and then coordinate a response. Standard operating procedures (SOPs) guided operators on how to respond to a given situation. It eventually became impractical for TMC operat