Skip to main content

Bombardier to supply new propulsion technology to London Underground

Rail technology supplier Bombardier Transportation has been awarded a contract by London Underground to supply new motors and traction control equipment for its fleet of Central line trains. This contract, which includes ongoing maintenance support, will run until 2024 and is valued by Bombardier Transportation at approximately US$143.7 million (£112.1 million). Bombardier's re-traction project is part of London Underground's larger Central Line Improvement Programme (which aims to bring a number of pas
August 29, 2017 Read time: 2 mins

Rail technology supplier 513 Bombardier Transportation has been awarded a contract by London Underground to supply new motors and traction control equipment for its fleet of Central line trains. This contract, which includes ongoing maintenance support, will run until 2024 and is valued by Bombardier Transportation at approximately US$143.7 million (£112.1 million).

Bombardier's re-traction project is part of London Underground's larger Central Line Improvement Programme (which aims to bring a number of passenger-focussed improvements and is expected to reduce customer-affecting failures on the Central line fleet.

For the programme, Bombardier will replace the direct current (DC) traction motors on Central line trains with the latest MITRAC alternating current (AC) traction systems and MITRAC traction control equipment. The Central Line '92 tube stock are the last London Underground trains to use DC traction motors, and MITRAC will bring benefits by reducing energy consumption while improving fleet reliability and performance. In total, Bombardier will supply new motors and traction control equipment for 85 eight-car Central Line trains (680 cars in total).

For more information on companies in this article

Related Content

  • UK county looking for major savings from Siemens traffic light upgrade
    May 14, 2012
    A major programme to upgrade traffic lights at 78 junctions and 100 pedestrian crossings across Norfolk, in the UK, with new energy-saving LED signals from Siemens is nearing completion. The retrofit project to supply, install and maintain all 178 sites is estimated to provide up to 78 per cent power consumption and carbon savings for Norfolk County Council (NCC). The new contract includes an innovative cost benefit payback solution provided by Siemens Financial Services.
  • Road user charging potential solution to transportation problems
    December 14, 2012
    A number of new and highly significant open road tolling schemes have just been launched or are soon to ‘go live’. Systems of road user charging are flexing their muscles as the means to solve politically sensitive transportation problems, reports Jon Masters. Gothenburg, January 2013, will be the time and place for the launch of the next city congestion charging scheme in Europe. In a separate development, Los Angeles County’s tolled Metro ExpressLanes began operating in November 2012 – the latest in a ser
  • Space transport systems: a new frontier
    November 12, 2024
    What would transport systems look like in space settlements? And what can that tell us about transport now on Earth? Dimitrios Milakis, of the Institute of Transport Research, looks for answers in the stars
  • European trends in environmental monitoring and enforcement
    February 2, 2012
    David Crawford surveys European trends in environmental monitoring and enforcement