Skip to main content

Bombardier to supply new propulsion technology to London Underground

Rail technology supplier Bombardier Transportation has been awarded a contract by London Underground to supply new motors and traction control equipment for its fleet of Central line trains. This contract, which includes ongoing maintenance support, will run until 2024 and is valued by Bombardier Transportation at approximately US$143.7 million (£112.1 million). Bombardier's re-traction project is part of London Underground's larger Central Line Improvement Programme (which aims to bring a number of pas
August 29, 2017 Read time: 2 mins

Rail technology supplier 513 Bombardier Transportation has been awarded a contract by London Underground to supply new motors and traction control equipment for its fleet of Central line trains. This contract, which includes ongoing maintenance support, will run until 2024 and is valued by Bombardier Transportation at approximately US$143.7 million (£112.1 million).

Bombardier's re-traction project is part of London Underground's larger Central Line Improvement Programme (which aims to bring a number of passenger-focussed improvements and is expected to reduce customer-affecting failures on the Central line fleet.

For the programme, Bombardier will replace the direct current (DC) traction motors on Central line trains with the latest MITRAC alternating current (AC) traction systems and MITRAC traction control equipment. The Central Line '92 tube stock are the last London Underground trains to use DC traction motors, and MITRAC will bring benefits by reducing energy consumption while improving fleet reliability and performance. In total, Bombardier will supply new motors and traction control equipment for 85 eight-car Central Line trains (680 cars in total).

For more information on companies in this article

Related Content

  • New York ramps up wheelchair accessibility
    August 3, 2021
    800 new buses will come with more flexible seating 
  • Flexibility, interoperability is key to future traffic management
    February 3, 2012
    Jon Taylor of Faber Maunsell and Tabatha Bailey of Transport for London describe how an unusual mix of traffic practitioners, researchers and industry are working together to build new tools for the future. As we face higher expectations for managing congestion from both citizens and politicians, and as more and more data is becoming available from new sources, our traffic management challenge is changing.
  • Lighting upgrade for Mersey tunnel
    November 6, 2014
    Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels. The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fitting
  • FOTsis targets ‘socially inclusive’ cooperative ITS
    December 5, 2013
    The FOTsis project addresses the imbalances between the vehicular and infrastructure sides of cooperative ITS infrastructures and looks to ensure road operators can help to enrich future technology applications. By Jason Barnes. Several developments have conspired to push the vehicular side of cooperative infrastructures/cooperative ITS to the fore in recent years. The automotive industry’s rather shorter product development and lifecycles combined with economic slowdown in many regions gave rise to the not