Skip to main content

Bombardier to build additional cars for Vancouver’s SkyTrain

TransLink, Metro Vancouver’s regional transportation authority, has ordered an additional 28 Bombardier INNOVIA Metro 300 vehicles for service on the city’s SkyTrain network. The order is valued at US$69 million and production is scheduled to start in the third quarter of 2017 and final delivery is expected in the fourth quarter of 2018. The new vehicles will support TransLink’s efforts to open new lines and provide additional capacity, by carrying up to 3,640 more people on the SkyTrain network at a tim
January 3, 2017 Read time: 1 min
376 TransLink, Metro Vancouver’s regional transportation authority, has ordered an additional 28 Bombardier INNOVIA Metro 300 vehicles for service on the city’s SkyTrain network. The order is valued at US$69 million and production is scheduled to start in the third quarter of 2017 and final delivery is expected in the fourth quarter of 2018.

The new vehicles will support TransLink’s efforts to open new lines and provide additional capacity, by carrying up to 3,640 more people on the SkyTrain network at a time.

“Our SkyTrain is the world’s longest driverless, automated rapid transit system and the additional 28 new Mark III SkyTrain cars will provide sorely needed additional capacity.” said Kevin Desmond, CEO of TransLink.

For more information on companies in this article

Related Content

  • MaaS Market Conference examines transportation’s new options
    January 9, 2018
    Second MaaS Market conference highlights pilots and fledgling services from around the world. That a revolution in the provision of transport services is underway is no longer in doubt. The only uncertainties are the precise form that revolution will take; who will be the winners and losers; and how long it will be before it takes root. Driven by passionate advocates of Mobility as a Service or – MaaS – a wide range of projects and different approaches are being developed worldwide. It is that move from
  • Michigan fosters real-world testing of workzone ITS
    September 19, 2017
    Turning a ‘problem’ into ‘an opportunity’ is the mantra of just about every business book and Michigan Department of Transportation (MDoT) looks set to achieve that aim in Oakland County, where 29km (18 miles) of the I-75 needs to be reconstructed. Running north-northwest from Detroit, the I-75 carries around 170,000 vehicles per day but, being built in the 1970s, it now requires an additional lane in each direction and upgrading to the latest design and safety standards. Upgrading will be carried out in
  • Platform announcement: public transport is running 10 years behind schedule
    March 10, 2023
    Public transport worldwide is under pressure on a variety of fronts. Jon Salmon of Snapper Services UK explains why the industry should look more at data – and pick up some tips from the retail sector
  • US pledges £250m aid to transit jobs
    June 23, 2021
    Transportation secretary Pete Buttigieg is allocating funds to projects in 31 US states