Skip to main content

Bogota's metro tender delayed

The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project. The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years. The metro will complement the existing urban transport system by handling 50 p
July 25, 2014 Read time: 2 mins

The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project.

The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years.

The metro will complement the existing urban transport system by handling 50 per cent of passengers at peak hours. Construction of the line was due to begin in 2015 and be completed by end-2018 or early 2019.

However, studies unveiled an environmental problem at the site where the maintenance and repair plant was to be built. Officials are currently looking for a different location, urban development institute head William Camargo has said. The change in plans led authorities to expand the metro line by four kilometres, to 30 kilometres with 31 stations.

"The extension will require two to three more months in order to end the year with the complete project design," Camargo said.

He said construction works could begin by the end of 2015 or early 2016.

Related Content

  • London needs just one road user charge, says report
    July 8, 2019
    London’s patchwork of road charging schemes should be replaced by a single, distance-based user charge, according to new research. Apart from anything else, it would be much fairer… The UK capital’s multiple road charging schemes require a radical overhaul, according to a new report by the Centre for London thinktank. The suggested solution is to replace existing levies on drivers with a single, distance-based user charge which would more fairly reflect how much, and at what time, people are using London
  • MaaS: 'It's been much easier to convince politicians than we expected'
    August 11, 2021
    As she leaves the Mobility as a Service sector, Piia Karjalainen explains why the user must continue to be the focus – and why we haven’t yet even seen half of the innovations available 
  • PPP wins US$4bn metro in São Paulo
    November 8, 2013
    A consortium composed of Brazilian engineering companies Odebrecht Transport and Queiroz Galvão and local groups UTC Participações and Eco Realty-Fundo de Investimento em Participações, has won a tender to build and operate the upcoming US$3.9 billion metro line 6 located in south-eastern Brazil's São Paulo city. Also known as the Laranja (orange) line, the subway will run some 15.9 kilometres between the Brasilândia and San Joaquin stations, with fifteen stations in all. It will connect the universitie
  • Arup reveals its vision of the future of rail
    July 2, 2014
    Engineering and consulting firm Arup has unveiled its vision of the future of rail travel in the light of trends such as urban population growth, climate change and emerging technologies. The Future of Rail 2050 foresees predictive maintenance of rail lines by robot drones; driverless trains travelling safely at high speed, freight delivered automatically to its destination, and smart technology designed to improve passenger experience and enable ticketless travel. According to Colin Stewart, Global