Skip to main content

Bogota's metro tender delayed

The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project. The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years. The metro will complement the existing urban transport system by handling 50 p
July 25, 2014 Read time: 2 mins

The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project.

The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years.

The metro will complement the existing urban transport system by handling 50 per cent of passengers at peak hours. Construction of the line was due to begin in 2015 and be completed by end-2018 or early 2019.

However, studies unveiled an environmental problem at the site where the maintenance and repair plant was to be built. Officials are currently looking for a different location, urban development institute head William Camargo has said. The change in plans led authorities to expand the metro line by four kilometres, to 30 kilometres with 31 stations.

"The extension will require two to three more months in order to end the year with the complete project design," Camargo said.

He said construction works could begin by the end of 2015 or early 2016.

Related Content

  • Call for interest issued for Toowoomba Second Range Crossing project
    February 6, 2014
    One of Queensland’s highest priority road infrastructure projects has been secured for the state, with the federal and Queensland governments announcing they will deliver the long-awaited tolled Toowoomba Second Range Crossing (TSRC). Deputy Prime Minister and Minister for Infrastructure and Regional Development Warren Truss called for the private sector to register interest in building the project. He said: “The registration process will move to a formal expression of interest stage over the next cou
  • Travel times halve for tolling converts
    August 5, 2013
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv
  • VW opens new vehicle plant in China
    August 1, 2012
    Prof Dr Jochem Heizmann, member of the board of management of Volkswagen AG, who is to be responsible for the new ‘China’ board of management function, and Dr Michael Macht, board member responsible for Group production, have inaugurated a new plant for Shanghai Volkswagen (SVW) in Yizheng, Eastern China, together with Hu Maoyuan, chairman of SAIC Motor Corporation. The plant is designed for an annual production capacity of 300,000 vehicles.
  • Improve and increase mass transit systems to minimise congestion
    January 24, 2012
    Rather looking to solve congestion by spreading the load, perhaps we need to look at concentrating it. Michael L. Sena writes. We humans were made to walk and run at embarrassingly slow speeds by comparison with other, more fleet-footed organisms. The sea is not our natural habitat and we were definitely not designed to fly unaided. Nevertheless, humankind has evolved a method of living during the past century that is dependent on transporting its members over very long distances during relatively short per