Skip to main content

Bogota's metro tender delayed

The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project. The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years. The metro will complement the existing urban transport system by handling 50 p
July 25, 2014 Read time: 2 mins

The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project.

The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years.

The metro will complement the existing urban transport system by handling 50 per cent of passengers at peak hours. Construction of the line was due to begin in 2015 and be completed by end-2018 or early 2019.

However, studies unveiled an environmental problem at the site where the maintenance and repair plant was to be built. Officials are currently looking for a different location, urban development institute head William Camargo has said. The change in plans led authorities to expand the metro line by four kilometres, to 30 kilometres with 31 stations.

"The extension will require two to three more months in order to end the year with the complete project design," Camargo said.

He said construction works could begin by the end of 2015 or early 2016.

Related Content

  • Peru's ‘chaotic’ traffic problems
    August 7, 2014
    Peru's ‘chaotic’ urban transport system generates losses of US$20 billion a year due to health, transport and economic costs, according to state news agency Andina. Luis Gutiérrez, head of Latin American BRT association (SIBRT), said accidents, pollution-caused breathing problems and sedentary-related illnesses cost US$8 billion a year in Peru, while transport-related problems such as time wasted in traffic and higher gasoline consumption cost another US$8 billion. The remaining US$4 billion is the impact o
  • TfL cycle superhighways plans will still disrupt traffic, says FTA
    January 28, 2015
    The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes. Subject to approval by Transport for London, construction of the routes will begin in March. Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunit
  • US infrastructure: once in a lifetime
    April 23, 2021
    Expectations are sky-high for Amtrak Joe and Mayor Pete as they use infrastructure spending to rebuild the US economy post-Covid – and ITS firms should be able to get a share...
  • Emissions reductions targets to have major impact on transport
    October 28, 2015
    As bold moves aimed at reducing greenhouse gas emissions have been introduced in California, David Crawford looks at the ramifications for transportation. California Governor Jerry Brown’s recent dramatic raising of the bar on emissions reduction policy for the state has won him praise from Japan, Australia, Europe and the secretariat of the critical UN conference on climate change being held in Paris in November/December 2015. His April 2015 executive order aimed at bringing emissions to 40% below 1990 lev