Skip to main content

Bogotá sets tentative timeline for metro tender

Bogotá mayor Gustavo Petro has announced that a tender for the Colombian capital's Line No. 1 metro project, which has been in the planning for a decade, could be issued by July. However, the final timeline for bidding will depend on whether the city is first able to line up financing for the project, the mayor added, according to local press reports. Building the metro line is expected to cost US$7.5 billion, or about double the previous estimates. In its current form, the metro line will extend some
February 6, 2015 Read time: 2 mins
Bogotá mayor Gustavo Petro has announced that a tender for the Colombian capital's Line No. 1 metro project, which has been in the planning for a decade, could be issued by July.

However, the final timeline for bidding will depend on whether the city is first able to line up financing for the project, the mayor added, according to local press reports. Building the metro line is expected to cost US$7.5 billion, or about double the previous estimates.

In its current form, the metro line will extend some 30km with 31 stations and is expected to begin operating by 2021.

In December, the mayor signed agreements with national development financing agency FDN, Colombian power holding EEB, and municipal urban development institute IDU to study methods of financing the mega-project, which is one of the most expensive in Colombia's history. These options include public-private partnerships (PPPs) and property taxes, among others.

"We think the metro project will require a variety of financing techniques," Petro has said

The project has the backing of the national government, and President Juan Manuel Santos has reaffirmed his support on numerous occasions. Earlier this week, government planning agency DNP's head, Simón Gaviria Muñoz, announced that the metro would be included in the 2014-2018 national development plan, which qualifies it for public funding.

However, the exact amount of government financing available is unclear, especially as the plummeting price of oil takes its toll on the country's fiscal accounts.

Gaviria added that government financing for the metro line could range between 40 per cent and 70 per cent of the total cost, but that the final amount hinges on the results of the financing studies currently underway.

Related Content

  • April 28, 2017
    Moody's: tolls will have a greater role in closing US highway funding gap
    In light of stagnant federal funding and limited capacity for states to increase spending, toll roads will play an increasing role in addressing the funding gap for road and bridge infrastructure needs in the US, according to a new report from Moody's Investors Service. Based on historical trends, Moody's projects more toll roads and increased tolling in areas with existing traffic congestion and growing economies, population and per capita income. The 2017 Infrastructure Report Card by the American Society
  • March 4, 2015
    Consortium to build Finnish motorway
    The Finnish Transport Agency has appointed a consortium of Meridiam Infrastructure and YIT Rakennus as the service provider which will build the E18 Hamina–Vaalimaa motorway in Finland on a public-private partnership (PPP) basis. Construction will commence in autumn 2015 and the entire motorway is estimated to be completed in 2018. The consortium will be responsible for financing of the project, as well as planning, construction and maintenance for a period of 20 years. The E18 Hamina–Vaalimaa project compr
  • February 17, 2016
    The steep drop in fuel prices and its effect on transportation in India, US and UK
    Industry insight from Steer Davies Gleave notes that increases in oil production and lower projected global demand growth for crude oil have contributed to declines in fuel prices, beginning in June 2014 and falling 70 per cent to the lowest point in January 2016. However, the impact of changing fuel prices is not uniform across transportation modes. For instance, in India, retail fuel prices have declined by only 20-25 per cent as a result of the central government increasing the excise duties to shore
  • July 17, 2012
    US economic stimulus package highlights ITS technology
    US Secretary of Transportation Ray LaHood talks to ITS International about economic stimulus funding and the absolute need to maintain and increase the use of technology in transportation. Of the total of $787 billion of funding announced under the American Recovery and Reinvestment Act (ARRA), the economic stimulus package which was signed into law by US President Barack Obama on 17 February 2009, $48.1 billion will go to the US Department of Transportation (USDOT). Of that, $27.5 billion is for highway in